Similar Projects
Madison Chocolate Company
Build-Out, Alteration - 3,125 SF
Design
Madison, WI 53719

Repair Sidewalks / Install Pull-out Lane Project
Alteration
Design
$25,000 to $100,000 est. value
Tomah, WI 54660

Hodag Park Music Gazebo
New Construction, Infrastructure - 220 SF
Bidding
$260,000 est. value
Rhinelander, WI 54501

Towers Parking Lot Reconstruction - GPC
Infrastructure
Bidding
$1,000,000 est. value
Eau Claire, WI 54701

Refrigerator/Freezer Install/Remove/Replace
Term Contract
Post-Bid
Racine, WI 53402

Veterans Memorial Field South Softball Field Site Redevelopment
Post-Bid
Portage, WI 53901

Parking Lot
Results
Milwaukee, WI 53205

2021 Street Projects 47
Results
Less than $2,000,000 est. value
Oconomowoc, WI

13 Lot Single Family Sub Division
New Construction
Construction
Mequon, WI 53097

Biosolids Drying, UV Disinfection and WPCF Upgrades
Infrastructure
Bidding
Beloit, WI

2021 Sidewalk Improvement Project
Post-Bid
$103,605 est. value
Portage, WI

T. Wrightstown, Cth Zz, Clay Street - Mallard Road
Results
WI

Maintenance Department Mailroom
Infrastructure
Bidding
Appleton, WI 54911

Lake Pacawa Park - Phase 2 Site Redevelopment
Post-Bid
Plover, WI

Spring Green - Madison, Walter Road
Results
WI

Last Updated 02/14/2022 02:52 AM
Project Title

Tomah - Mauston, STH 82 Interchange / B-29-36, 152-155, 157

Physical Address View project details and contacts
City, State (County) WI   (Juneau County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation, Base, Concrete Pavement, HMA Pavement, Asphaltic Surface, Curb and Gutter, Sidewalk, Signs, Beam Guard, Pavement Marking, Traffic Signals, Street Lights, Structure Construction, Deck Replacement, Culvert Pipes, and Storm Sewer., Excavation Common, 136,955 CY; Excavation Marsh, 220 CY; Selected Borrow, 46,923 CY; Backfill Structure, 2,584 Ton; Base Aggregate Dense, 111,451 Ton; Select Crushed Material, 456 Ton; Concrete Pavement, 84,462 SY; Concrete Masonry Bridges, 5,197 CY; Prestressed Girders, 3,465 LF 36-Inch, 2,896 LF 45-Inch; Bar Steel Reinforcement, 89,960 Lbs; Bar Steel Reinforcement Coated, 758,920 Lbs; Piling Steel, 600 LF 10-Inch, 13,825 LF 12-Inch; Marking Epoxy, 12,806 LF; Construction Staking, 128,992 LF; Construction Staking, 149 Each; Construction Staking, 4 LS; Conduit, 9,303 LF; Culvert Pipe, 16 LF 18”, 54 LF 30“, 14 LF 36“, 10 LF 48“, 96 LF 12“, 10 LF 18”, 484 LF 24”; Storm Sewer Pipe, 26 LF 30“, 730 LF 12“, 20 LF 15“, 610 LF 18“, 1,970 LF 24“, 288 LF 12”, 536 LF 15”, 222 LF 15”; Storm Sewer / Culvert Pipe Horizontal Elliptical or Pipe Arch, 124 LF 19” X 30”, 528 LF 24“ X 38”; Concrete Curb and Gutter, 12,822 LF; Concrete Sidewalk, 72,621 SF; Beam Guard, 7,825 LF; Beam Guard Energy Absorbing Terminals, 17 Each; Asphaltic Surface, 431 Ton; HMA Pavement, 18,025 Ton; Removing Asphaltic Surface Milling, 11,659 SY; Tack Coat, 1,424 Gals; Signs, 2,338 SF

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents