Similar Projects
SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

Rapid Response Single Award Task Order Contract (SATOC)
New Construction
Bidding
Less than $95,000,000 est. value

Facility Repair & Renewal (FRR) (MATOC) Phase 1
Post-Bid
Less than $450,000,000 est. value
Washington, DC

Secure Construction SATOC
Post-Bid
$100,000,000 est. value
Washington, DC

Air Force Contract Augmentation Program (AFCAP) V
Results

Job Order Contracts (Joc) Region C
New Construction, Renovation
Results
$10,000,000 est. value

Construction of the New Sussex County Public Safety Building
Addition - 19,999 SF
Construction
$12,000,000 est. value
Georgetown, DE 19947

USACE Philadelphia District-wide SRM MATOC
New Construction
Design
$25,000,000 to $100,000,000 est. value
Philadelphia, PA 19107

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

Y--Design Build, Design Bid Build, Indefinite Delivery, Indefinite Quantity Multiple Award Construction Contract For Facilities In The North Aor.
Results
Less than $95,000,000 est. value

USCG National Multiple Award Construction Contract (NMACC III)
New Construction, Renovation, Addition
Post-Bid

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

D/B Northeast MATOC
Results
$1,000,000 to $250,000,000 est. value

Last Updated 01/26/2022 06:21 PM
Project Title

Construction Manager and General Contractor - Replacement of Bridge on Sr 54 Lighthouse Road

Physical Address View project details and contacts
City, State (County) Selbyville, DE   (Sussex County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), All Submissions Received, Selection Expected March 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Replacement of Bridge 3-437 on SR 54 Lighthouse Road project was initiated in 2019 to address the increasing deterioration of Bridge 3-437. The project purpose is to provide structural improvements that promote longevity of the bridge, minimize future maintenance, and improve safety to the traveling public while preserving mobility for local residents and businesses. ore specifically, the replacement of Bridge 3-437 was initiated to address severe deterioration of the existing structure. Bridge 3-437 was listed as 75th on DelDOT’s Bridge Deficiency List in 2020 and currently has a sufficiency rating of 41.0. After evaluating potential design options, it was deemed that rehabilitation was not cost effective and traditional replacement techniques would create excessive impacts to the traveling public. As such, DelDOT has opted to utilize accelerated bridge construction (ABC) techniques in order to provide a safe solution while also minimizing traffic impacts

Details

Misc. Buildings, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents