Reported 04/28/2020 12:00 AM
Project Title

Right of Way Improvements

Physical Address View project details and contacts
City, State (County) Thomaston, GA 30286   (Upson County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements to sewer right of way between Jeff Davis Road South and Rocky Creek Lift Station (approximately 5400 feet). The right of way will be mulched and chipped, all over hanging trees/limbs will be trimmed and mulched or chipped. Any old trees or stumps obstructing the right of way will be re-chipped or removed. A survey has been conducted on the right of way; stakes are placed approximately 100 feet apart, marking the boundaries.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents