Similar Projects
Google Middlefield Park Master Plan
New Construction - 3,455,000 SF
Conception
$10,000,000 CJ est. value
Mountain View, CA

Cambrian Park Plaza Shopping Center
New Construction, Demolition - 184,060 SF
Conception
$10,000,000 CJ est. value
San Jose, CA 95124

Icon/Echo Towers
New Construction, Demolition - 478,500 SF
Design
$600,000,000 est. value
San Jose, CA 95113

Soccer Bleacher Improvements Project
New Construction
Bidding
$50,000 est. value
San Jose, CA

Park: All Inclusive Playground - Emma Prusch
New Construction
Post-Bid
$2,250,001 to $2,750,000 est. value
San Jose, CA

Park Tennis Court Reconstruction Braly and Columbia Fairwood
Renovation
Post-Bid
Sunnyvale, CA

Creekside and Meadowbrook Group Area Renovation at Vasona Lake County Park
Renovation
Results
$924,206 est. value
Los Gatos, CA 95032

All Inclusive Rotary Playgarden
New Construction
Results
$1,300,000 est. value
San Jose, CA 95154

Forest Hill Elementary School Phase One
New Construction
Construction
$4,500,000 est. value
San Jose, CA 95130

Mixed-Use Residential Village
New Construction
Pending Verification
San Jose, CA 95131

Newbury Park
New Construction
Post-Bid
$1,155,000 est. value
San Jose, CA 95133

FEMA JFG Koi Pond and Pump
New Construction, Infrastructure
Results
$1,751,702 est. value
San Jose, CA 95112

Phase One Modernizations at Five School Sites
Renovation
Post-Bid
San Jose, CA

BSN Sports 15 Row 15 Vertical Picket Bleacher
Renovation
Results
San Jose, CA

Bundled Park Playground Replacement
Renovation, Term Contract
Post-Bid
$3,621,910 est. value
San Jose, CA

Last Updated 05/02/2022 12:47 AM
Project Title

Montague Elementary All-Inclusive Playground

Physical Address View project details and contacts
City, State (County) Santa Clara, CA 95054   (Santa Clara County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $937,675 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project is generally described as coordination with manufacturer for new play structure, installation of flush concrete curbs and poured-in-place rubber surfacing; site grading, new asphalt and fencing; AC pavement resurfacing, markings, andinstallation of hardcourt equipment; accessible restroom upgrades; accessible parking upgrade.

Details

Park/Playground, New Construction, Elementary School, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Selective Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents