Similar Projects
West City Line to CSAH 2 - Wright County
Infrastructure
Conception
$522,000 CJ est. value
Maple Lake, MN 55358

West City Line to CSAH 2 - Wright County
Infrastructure
Conception
$522,000 CJ est. value
Maple Lake, MN 55358

Reconstruction
Infrastructure
Design
$9,100,000 CJ est. value
Buffalo, MN 55313

Reconstruction
Infrastructure
Design
$9,100,000 CJ est. value
Buffalo, MN 55313

2023 Street Maintenance
Infrastructure
Bidding
$700,000 CJ est. value
Buffalo, MN 55313

2023 Street Maintenance
Infrastructure
Bidding
$700,000 CJ est. value
Buffalo, MN 55313

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

TH 24/Hemlock Street Roundabout and Hemlock Street Full Depth Reclamation
Infrastructure
Post-Bid
$2,269,748 CJ est. value
Annandale, MN 55302

Newcomb Avenue Resurfacing
Infrastructure
Results
$111,420 est. value
Cokato, MN 55321

Grading, Bituminous Surfacing, Retaining Walls, Noise Walls, Ada Improvements, Signals, Lighting, Tms and Bridge Nos
New Construction, Infrastructure
Results

Advanced Volumetric Alliance Factory
New Construction, Infrastructure - 180,000 SF
Construction
$10,000,000 CJ est. value
Albertville, MN

CSAH 37 Reconstruction Project
Infrastructure
Construction
$6,789,521 CJ est. value
Maple Lake, MN 55358

Monticello Lakes Apartments
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Monticello, MN 55362

Monticello Lakes Apartments
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Monticello, MN 55362

TH 25 to CSAH 14 - Wright County
Infrastructure
Conception
$603,000 CJ est. value
Maple Lake, MN 55358

Last Updated 06/13/2023 09:33 AM
Project Title

Buffalo, City of TH 25 Reconstruction

Physical Address View project details and contacts
City, State (County) Buffalo, MN 55313   (Wright County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $12,132,191 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

AS of June 5, 2023, the project has been awarded. A timeline for construction has not been confirmed. Project Number - B2110443.00, TERR-1008025, W13.111185 SP 8604-37; SP 213-010-007 The Work Includes the Construction of Approximately: 26,500 Cu Yd Common Excavation (P) 4,750 Cu Yd Common Embankment (P) 7,200 Cu Yd Aggregate Base (Cv) 17,500 Cu Yd Select Granular 5,900 Ton Bituminous Surfacing 8,000 Sq Ft Modular Retaining Wall 3 Ls Lighting Sytem 1 Ls Lift Station 143 Lin Ft Sanitary Manhole 6,400 Lin Ft 12" Pvc Forcemain 5,350 Lin Ft 8" -16" Pvc Sanitary Sewer 4,500 Lin Ft 6" - 16" Pvc Watermain 11 Each Hydrant 347 Lin Ft Construct Drainage Structure 7,550 Lin Ft Draintile 4,500 Lin Ft 12" - 73" Rcp Storm Sewer 9,500 Lin Ft Curb & Gutter 59,700 Sq Ft Concrete Walk 1,600 Sq Yd Concrete Driveway Pavement 10 Acres Turf Establishment Together With Numerous Related Items of Work, All in Accordance With Plans and Specifications. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents