Similar Projects
Upgrade Mixing Valves, Faucets, and Showers
Renovation
Sub-Bidding
$2,000,000 CJ est. value
Nashville, TN 37212

Eyewash Stations Upgrade - Middle TN
Renovation
Sub-Bidding
$250,000 CJ est. value
Nashville, TN 37219

TCAT HVAC, Plumbing and Lighting Upgrades
Alteration
Post-Bid
$640,000 est. value
Paris, TN 38242

Maintenance Shop Plumbing
Alteration
Post-Bid
Mount Juliet, TN 37122

Correct Plumbing Piping and Replace Fixtures
Results
$5,000,000 to $10,000,000 est. value
Memphis, TN 38104

Pink Palace Museum - Mansion Plumbing Replacement
Alteration
Results
$48,900 est. value
Memphis, TN 38111

Plumbing Service and Repair
Term Contract
Post-Bid
Less than $25,000 est. value
Nashville, TN

South Water Treatment Plant Piping Modifications
Infrastructure, Alteration
Results
Millington, TN 38053

Water Bottle Filling Stations
Alteration
Post-Bid
Tazewell, TN

Plumbing Improvement at Mill Creek Middle
Alteration
Results
$139,000 est. value
Nolensville, TN 37135

Miscellaneous Plumbing Services Supplementary
Term Contract
Post-Bid
Knoxville, TN

Floor Drains and Plumbing Upgrades
Renovation
Results
$821,212 CJ est. value
Nashville, TN 37203

2018 Humboldt LPRF Parks ADA Building Improvements
Infrastructure
Post-Bid
Humboldt, TN

Kinsler Ave. & Parkcliff Dr. Waterline Replacement
Infrastructure
Results
$321,589 CJ est. value
Kingsport, TN 37660

Lawrenceburg Head Start Plumbing
Infrastructure
Post-Bid
Lawrenceburg, TN

Last Updated 06/21/2023 05:05 PM
Project Title

Statewide Facilities Maintenance Shops Eyewash Station Upgrades

Physical Address View project details and contacts
City, State (County) Nashville, TN 37219   (Davidson County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Sub-Bidding Closed, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Electrical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide all materials and labor to upgrade emergency eyewash/safety showers to comply with all current codes and federal regulations to deliver minimum 20 GPM of tepid water for 15-minute duration. Work may include, but not be limited to plumbing, electrical, pipe and electrical supports, firestopping, alarm wiring, patching, demolition, and disposal. Refer to site specific drawings for required work at each project site. All new work shall comply with the design and plans issued for the facility. The Contractor with the winning bid shall be the prime Contractor and responsible for all work. Contractor shall provide all materials and labor to upgrade emergency eyewash/safety showers to comply with all current codes and federal regulations to deliver minimum 20 GPM of tepid water for 15-minute duration. Work may include, but not be limited to plumbing, electrical, pipe and electrical supports, firestopping, alarm wiring, patching, demolition, and disposal. Refer to site specific drawings for required work at each project site. Contractor shall schedule a pre-construction meeting with the designer and project manager within 14 days of receipt of purchase order. Construction plans, details, and equipment will be discussed for each facility. Expected power or utility interruptions will be discussed. Prior to start of onsite work, all interruptions will be reviewed/scheduled with the facility manager. All questions must be submitted no later than June 12, 2023.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents