Similar Projects
New Wastewater Treatment Plant
New Construction
Conception
Milton, FL

North Water Reclamation Facility Storage Expansion
Addition
Conception
$453,000 est. value
Palmetto, FL 34221

Northwest Wastewater Plant Operations Building
New Construction - 1,500 SF
Design
$8,000,000 to $10,000,000 est. value
Tampa, FL

Flagler Beach Wastewater Treatment Plant
New Construction
Design
Flagler Beach, FL

RFP Design - Flow Diversion - Daniels Pkwy Area 1 to Gateway Water Reclamation Facility
Renovation
Bidding
$1,000,000 CJ est. value
Fort Myers, FL 33901

Waste Water Treatment Facility Improvements - Phase 2
Renovation, Infrastructure
Bidding
$20,000,000 CJ est. value
Davenport, FL 33837

Procurement of and Assembly of Portable Chiller Plants on Skid Flatbed Trailers
New Construction
Sub-Bidding
$2,500,000 CJ est. value
Naples, FL 34102

Hydrofluosilicic Acid, Bulk Supply and Delivery
Term Contract
Sub-Bidding
$150,000 CJ est. value
Tampa, FL 33602

Wastewater Treatment Facility Filter No. 2 Replacement
Post-Bid
Less than $625,000 est. value
Port Saint Lucie, FL 34986

Wastewater Treatment Facility Improvements Phase 1
Post-Bid
Less than $4,900,000 est. value
Davenport, FL

Wastewater Treatment Plant
Results
Less than $1,732,450 est. value
Starke, FL 32091

South Water Reclamation Facility Maintenance Building Improvement and Transformer Replacement Project
Results
$2,286,000 est. value
Orlando, FL 32819

Greenland Water Reclamation Facility (WRF)
Construction
$100,000,000 est. value
Jacksonville, FL 32202

Airport Water Reclamation Facility Phase III Expansion
Construction
Brooksville, FL 34613

Southern Region Water Reclamation Facility Process Improvements
Infrastructure
Pending Verification
$22,500,000 CJ est. value
West Palm Beach, FL 33401

Last Updated 08/04/2022 08:01 PM
Project Title

PGA Wastewater Treatment Plant Operations Building Roof Replacement

Physical Address View project details and contacts
City, State (County) Palm Beach Gardens, FL 33418   (Palm Beach County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $283,900 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The OWNER for the Project is Seacoast Utility Authority. The ENGINEER for the Project is Holtz Consulting Engineers, Inc. The Work is generally described as follows: The project entails replacement of the existing roof, associated lightning protection system, and the replacement of the laboratory exhaust fan for the PGA WWTP Operations Building The Contractor shall remove the existing roofing system and replace both upper and lower decks and include a bituminous membrane built-up roof system, cap flashing, equipment and HVAC housekeeping slabs and penetrations as shown on the drawings and specifications. Seacoast posts all of its Bidding Documents on webite. The term Bidding Documents includes the Invitation to Bid, Instructions to Bidders, the Bid Form, and the Contract Documents (including all Addenda issued prior to Bid opening). Seacoast makes all reasonable efforts to ensure that information posted on DemandStar is accurate and up to date, although it does not warrant the accuracy and completeness of such data. Nevertheless, Prospective Bidders are advised that, in order to procure and keep abreast of addenda or other information, which may be pertinent or material to the bid, they should consult the DemandStar website. DemandStar offers a free single agency subscription, which includes free document downloads, by registering at or by calling (800) 711-1712. Bidders with technical questions concerning the Bidding Documents or forms to be completed and submitted with the bid should contact the Engineer in writing in accordance with the Instructions to Bidders at Fax: 561-575-2009 or by email to Curtis.Robinson@holtzconsulting.com. The Contract is a LUMP SUM contract. No Bids may be withdrawn for a period of ninety (90) days after the day of Bid opening. The cost of Bid preparation is considered an operational cost of Bidders and shall not be passed on or borne by the Owner. The Successful Bidder, who is awarded the contract, will be required to furnish a Public Construction Bond in full contract amount in accordance with Florida Statute Section 255.05, and to submit a Certificate of Insurance demonstrating conformance with the Contract Documents. For the project Builder's Risk Insurance is NOT required. Failing to do so shall be grounds to reject the bid and shall result in the Owner retaining the Bid Security to the full extent of Owner's damages. Bids shall be prepared, addressed, and submitted in compliance with detailed instructions as set forth in the Instructions to Bidders. All forms and questionnaires must be filled out completely as instructed. Failure to complete the bid forms as instructed and provide the requested information, or to fully execute the bid, shall be grounds for rejection of the bid and shall result in the Owner retaining the Bid Security to the full extent of Owner's damages. Seacoast Utility Authority reserves the right to reject any or all Bids in whole or in part, with or without cause, to waive irregularities, variances, deviations, technical errors, and informalities to the extent permitted by law, or to accept the Bid which in its judgment best serves the public interest.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents