Similar Projects
Duello Road Phase 3A Watermain Relocation
Infrastructure
Bidding
$150,000 CJ est. value
Lake Saint Louis, MO 63367

Carden Park Elementary School Drainage Improvements
Infrastructure
Bidding
$175,000 CJ est. value
Saint Joseph, MO 64503

Removal and Installation of Submersible Recirculation Pump
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Mexico, MO 65265

Rockhill Steam Line Replacement
Renovation, Alteration
Post-Bid
$1,453,000 est. value
Kansas City, MO 64110

Plumbing Services
Alteration
Post-Bid
MO

District Wide Drinking Fountain/Bottle Filler Installation
Alteration
Results
Hazelwood, MO

McCracken Road Dam Rehabilitation
Infrastructure
Results
$2,000,000 CJ est. value
Ozark, MO 65721

Plumbing
Renovation
Construction
$16,000 CJ est. value
Saint Charles, MO 63301

Pump and Triple Duty Valve Replacement - Hazelwood Opportunity Center
Alteration
Post-Bid
$30,000 est. value
Spanish Lake, MO 63138

Installation of Flow Meter
Infrastructure
Results
$126,365 CJ est. value
Saint Louis, MO 63103

Plumbing Services 2022
Term Contract
Post-Bid
Saint Louis, MO 63110

Eltora Wet Weather Storage Facility
Demolition, New Construction, Infrastructure
Results
$187,986 CJ est. value
Saint Louis, MO 63130

McClendon Ditch Sewer Improvements
Infrastructure
Post-Bid
$6,168,200 CJ est. value
Lees Summit, MO 64081

Water Main Improvements Hwy N & Z
Infrastructure
Results
$376,585 CJ est. value
Cottleville, MO 63366

D/B - RMO22864 - Fire Loop Piping at Sammy Davis Federal Building
Alteration
Post-Bid
Kansas City, MO

Last Updated 08/05/2023 11:06 PM
Project Title

Johnston Drive Extension

Physical Address View project details and contacts
City, State (County) Raymore, MO 64083   (Cass County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $497,877 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This primary work for this project will be the construction of approximately 700 of new road. There will also be approximately 1700 SY of Mill and overlay work as well as small amounts of storm sewer and waterline work. Proposals will be opened on said date and time and only the bidder name and base proposal price will be read aloud. A bid bond or certified check from a surety or bank, approved by the Purchasing Specialist, in an amount equal to, or greater than, 5% of the maximum total bid price must accompany each proposal. All wages paid for work under this contract shall comply with the requirements of the prevailing wage law of the State of Missouri, Missouri Public Law 294, Sec. 290.210 through 290.340, R.S. MO. 1969, as amended. The Owner reserves the right to reject any or all proposals and to waive informalities or deficiencies therein. Bidder must be a plan holder with the City of Raymore in order to bid on the project. Contractor shall complete work within 60 calendar days of execution of the Notice to Proceed.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents