Similar Projects
Automation of Fiber Line at Boulder County Recycling Center - BCRC
Bidding
CO

On-Call Directional Boring
Bidding
CO

Kiln Room Mitigation
Post-Bid
CO

MV DIST - 30th & Colorado Relocation
Post-Bid
Less than $650,000 est. value
Boulder, CO

Uninterruptible Power Supply (UPS) Maintenance
Results
Boulder, CO

LED Stage Lighting
Results
$30,000 to $35,000 est. value
Boulder, CO

Building 1 Circuit Breaker Replacement
Bidding
Boulder, CO 80305

Maintenance and Support for Eaton UPS and Cellwatch Systems
Post-Bid
Boulder, CO

Purchase of 2 UPS Units and Equipment Including Install, Testing and Programming
Results
Broomfield, CO 80020

District Wide Generator Maintenance
Post-Bid
Longmont, CO 80503

Dilution Refrigerator Helium Battery System
Results
Boulder, CO 80305

Louisville Utilities Electrical Assessment
Post-Bid
Louisville, CO 80027

Electrical Contractors
Results
Less than $1,000,000 est. value
Longmont, CO 80503

Install CSMS Emergency Generator
Post-Bid
Less than $400,000 est. value
Longmont, CO 80112

Data Center UPS Replacement
Results
$40,000 to $50,000 est. value
Boulder, CO

Reported 12/03/2020 12:00 AM
Project Title

Generator Replacement

Physical Address View project details and contacts
City, State (County) Longmont, CO   (Boulder County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor will be required to Design and install a diesel-powered generator, diesel secondary containment tank, and ATS onto a concrete pad at the suggested location. Contractor shall: 1. Determine power load for the facility. a. Power at Transformer: 50 KVA, Single Phase, 120/240 volts b. Complete an analysis to determine the new generator specifications required to maintain operations at the magnetic observatory. c. Generator must be capable of operating 7 buildings and equipment for a minimum of 3 days. d. Install a single-point easy-access terminal disconnect (emergency disconnect) between the generator-ATS locations and the site. 2. Design and install a concrete pad. a. Ensure a good design location for the installation of a concrete pad. b. The pad shall be designed to support the generator, ATS, and diesel tank. c. The type of generator-to-pad connections should account for all design variables; such as, vibration, weather, and fatigue created by new generators operations. d. Provide a minimum of 4 safety bollards on each side of the new pad to ensure no damage to the generator system occurs during refueling or maintenance. e. Provide chamfered concrete edges on the top edge of pad to reduce future spalling.

Details

Division 26 - Electrical, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents