Similar Projects
Pequea Mennonite School Gym and Classrooms
New Construction - 13,262 SF
Design
$750,000 to $800,000 est. value
Narvon, PA 17601

Kensington High School Building Envelope Renovation
Design
Philadelphia, PA

Interior Alterations at Mariana Bracetti Academy Charter School`s Annex
Renovation
Post-Bid
Philadelphia, PA 19124

Alterations to Moniteau Junior and Senior High School and Dassa McKinney Elementary School
Post-Bid
West Sunbury, PA 16061

Turnkey Development of New K-8 School
New Construction
Results
Less than $70,000,000 est. value
Philadelphia, PA

Bloomsburg Area School District High School Middle School Renovations and Additions
Renovation, Addition
Results
Bloomsburg, PA 17815

Rose Rent Lofts
Renovation, Demolition - 66,600 SF
Construction
$7,000,000 est. value
Chambersburg, PA 17201

Gymnasium and Site Improvements for Existing Vocational School
Renovation - 468 SF
Construction
Pittsburgh, PA 15204

Exterior Window Replacement at Mariana Bracetti Academy Charter School`s Annex
Renovation
Post-Bid
Philadelphia, PA 19124

Summer 2019 Capital Improvements
Results
PA

Additions and Renovations of the Whitehall High School
Renovation, Addition
Construction
Whitehall, PA 18052

Hershey High School Concession Stand Addition
Addition
Post-Bid
Hershey, PA 17033

North Building Renovations to Fitness Center
Renovation
Results
$400,000 est. value
State College, PA 16801

Cambria Heights High School Phase Two Alterations
Renovation
Construction
Patton, PA 16668

Springfield High School Phase 2 - Bid Package 3
New Construction - 10,000 SF
Post-Bid
Springfield, PA 19064

Reported 12/20/2019 12:00 AM
Project Title

Site Paving and Miscellaneous Interior Renovations Conemaugh Valley Junior/Senior High School

Physical Address View project details and contacts
City, State (County) Johnstown, PA 15906   (Cambria County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center - 12/02/19
Owner View project details and contacts
Architect View project details and contacts
Description

General Construction: Gymnasium floor refinishing, gypsum and EIFS wall construction, shop overhead door, chairlift replacement: minor electrical work to be subcontracted by GC. Site Paving Construction : Bituminous paving of entry repairs / replacements at entry drive, bus loop and parking lot; concrete curbs, sidewalks and ADA parking associated with paving

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 32 - Exterior Improvements, Flexible Paving.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents