Similar Projects
UV Disinfection for Springville Lagoon
Renovation, Infrastructure
Bidding
$2,000,000 CJ est. value
Springville, AL 35146

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Constructing the Resurfacing (Surface Treatment), Guardrail Safety Improvements, and Traffic Stripe on SR-53 (US-231) from the Shelby County Line to the Junction of SR-34 in Pell City
Infrastructure
Results
$1,044,035 to $1,276,043 est. value
AL

Safety Improvements (Traffic Signal Relocation and Improvements) on CR-193 (Hazelwood Drive)
Infrastructure
Results
$2,009,217 CJ est. value
Pell City, AL 35125

Dr John Haynes Drive Development
New Construction, Infrastructure - 100,000 SF
Construction
$27,000,000 CJ est. value
Pell City, AL 35125

Douglas Manufacturing Addition / Pell City
Addition, Demolition, Infrastructure - 15,000 SF
Pending Verification
$2,000,000 CJ est. value
Pell City, AL 35125

Police Station Relocation - City of Pell City
Addition, Renovation, Infrastructure
Pending Verification
$3,559,250 CJ est. value
Pell City, AL 35128

Eden Elementary School Addition and Coosa Valley Elementary School Addition
Addition, Demolition, Infrastructure
Post-Bid
$314,000 CJ est. value
Pell City, AL 35125

Constructing the Roadway Safety Improvements on Mays Bend Road
Infrastructure
Results
$200,254 CJ est. value
Pell City, AL 35128

Chick-fil-A #2544 / Pell City
Infrastructure
Post-Bid
$100,000 CJ est. value
Pell City, AL 35125

Constructing the Intersection Improvements (Grading, Drainage, Pavement, and Traffic Signals) on Sr-25 (Us-411) at Cr-10 (Park Avenue)
Infrastructure
Results
$1,521,539 CJ est. value
Moody, AL 35004

St. Clair County Pandemic Response Center / Odenville
New Construction, Infrastructure
Post-Bid
$900,000 CJ est. value
Odenville, AL 35120

T-Hangar Construction
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Pell City, AL 35125

St. Clair County Airport Authority Corporate Hangar
New Construction, Infrastructure - 11,840 SF
Post-Bid
$975,000 CJ est. value
Pell City, AL 35128

Last Updated 08/23/2023 07:22 PM
Project Title

Constructing the Intersection Improvements

Physical Address View project details and contacts
City, State (County) Springville, AL 35146   (Saint Clair County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $2,516,427 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Constructing the Intersection Improvements The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. The Entire Project Shall Be Completed In One Hundred Seventy (170) Working Days. A 4.00% DBE Contract Obligation Is Required. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The bracket range is shown only to provide general financial information to contractors and bonding companies concerning the project's complexity and size. This Bracket should not be used in preparing a bid, nor will this bracket have any bearing on the decision to award this contract. The Bracket Estimate On This Project Is From $2,058,894 To $2,516,427 . In accordance with the rules and regulations of The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. Section 34-8-8. Code of Alabama 1975 as amended states in part as follows: '... it will be necessary for him or her to show evidence of license before his or her bid is considered,' Further, Section 34-8-8, Code of Alabama 1975 as amended also states in part as follows: 'All Owners, Architects, and engineers receiving bids pursuant to this chapter shall require the person, firm, or corporation to include his or her current license number on the bid.' The right to reject any or all bids is reserved. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents