Similar Projects
Four Seasons Storage Facility
New Construction
Conception
Shorewood, IL 60404

ShipBob Fulfillment Centers Master Plan
New Construction
Conception
Chicago, IL 60607

Amazon Warehouse
New Construction - 112,000 SF
Design
Chicago, IL 60654

Building Demolition and Salt Storage Building
New Construction, Demolition - 5,500 SF
Design
Less than $750,000 est. value
Roscoe, IL 61073

Pin & Link Assembly Expansion Joint Retrofits 2
Alteration
Bidding
Chicago, IL

Pin & Link Assembly Expansion Joint Retrofits 4
Alteration
Bidding
Chicago, IL

Concrete Recycling at S.T.P
Post-Bid
Morton, IL 61550

Professional Services for Ladue Place Sidewalk and Stairs
Post-Bid
Greenville, IL

Replace Concrete & Diamond Plate Platform
Results
Chicago, IL

Chicago Sanitary Ship Canal Electric Dispersal Barrier Boat Shed
Results
$1,000,000 to $5,000,000 est. value
Romeoville, IL 60446

LogiPark 57-80 Distribution Warehouse
New Construction - 2,400,000 SF
Construction
$10,000,000 CJ est. value
Country Club Hills, IL 60478

Ricky Rockets Fuel Center & Retail
New Construction, Demolition - 117,270 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Buffalo Grove, IL 60089

Warehouse Distribution Buildings & Associated Office
New Construction - 428,431 SF
Pending Verification
Palatine, IL 60067

Abt Electronics Warehouse Expansion
Addition - 429,524 SF
Pending Verification
Glenview, IL 60025

Elion Logistics Park Expansion
New Construction - 6,098,100 SF
Conception
$10,000,000 CJ est. value
Wilmington, IL

Reported 01/22/2022 12:00 AM
Project Title

Concrete Bin

Physical Address View project details and contacts
City, State (County) Urbana, IL 61802   (Champaign County)
Category(s) Commercial, Single Trades
Sub-Category(s) Concrete, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Completion Expected March 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a materials bin with a concrete slab and bin block walls.

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents