Similar Projects
Willow Lakes - Master Plan
New Construction - 650,000 SF
Conception
$595,000,000 est. value
Fort Pierce, FL 34945

Southern Boulevard Town Center
New Construction - 400,000 SF
Conception
$10,000,000 CJ est. value
Royal Palm Beach, FL 33414

Neo Square Apartments
New Construction - 423,679 SF
Design
$8,000,000 est. value
Kissimmee, FL 34744

Live! Resorts Pompano
New Construction - 2,482,473 SF
Design
$10,000,000 CJ est. value
Pompano Beach, FL 33069

Construction Services Log Cabin Park Gazebo Repair and Upgrade Project
Bidding
$10,000 to $15,000 est. value
Sneads, FL

Tradewinds Park Educational Farm and Gardens
New Construction
Bidding
$8,500,000 est. value
Coconut Creek, FL 33066

Imagine Clearwater Park (Buildings, Hardscape, Landscape and Other Site Improvements)
New Construction
Sub-Bidding
Clearwater, FL 34621

Construction of a 10 X 10 Picnic Pavilion
Post-Bid
Brooker, FL 32622

Safety Harbor City Park - Bleacher Seating Shades
Post-Bid
Safety Harbor, FL 34695

Construction Manager at Risk for the New Alachua County Fairgrounds
Results
FL

Kester Park Concession Renovation and New Restroom Building Construction
Renovation
Results
Less than $450,000 est. value
Pompano Beach, FL

Lake Lorna Doone Park Improvements - Phase II
New Construction, Renovation, Demolition
Construction
$8,000,000 est. value
Orlando, FL 32805

Ibis Golf and Country Club
New Construction, Addition - 25,252 SF
Construction
$5,600,000 est. value
West Palm Beach, FL 33412

Sun City Center Multipurpose Building
New Construction
Pending Verification
Sun City Center, FL 33573

PGA National Resort
New Construction, Renovation
Conception
Palm Beach Gardens, FL 33418

Last Updated 12/22/2020 02:45 PM
Project Title

Design, Engineer, and Install Fuel Canopy for the PWC Complex

Physical Address View project details and contacts
City, State (County) Sanford, FL 32771   (Seminole County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $143,779
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

I. The general items of work to be done hereunder consist of the following; a. The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Proposal Documents to construct the above-stated project. b. The Fuel Canopy specs shall require the following: i. The structure shall be least 52’x72’ width and length, single slope 15’ low side 17” high side canopy and columns spacing to accommodate large buses/transit vehicle on the south side of the above ground storage tanks.. ii. Galvalume PBR roof panels iii. Galvanized Z purlins iv. Open all four sides v. Eight foundations vi. Eight columns vii. Engineering design and building permits c. Underground utilities locates d. Onsite dirt relocation's e. The Structure shall be manufactured with quality components and include at least 12 month workmanship warranty. f. The Structure shall include the wet stamped engineering drawings, structural steel frame, steel cables, all fasteners, and installation of structures including project management and foundation. g. The shade structure shall conform to the current adopted version of the State of Florida Building Code 2017. h. Saw-cut breakout and remove concrete of the installation of eight concrete canopy footings 5’x5x’6 with anchor bolts for new fuel island canopy. i. Square off existing concrete, form and pour concrete for excavated areas to existing finish great. j. Soil test and approval by Contractor, if required by the City Building Department k. Stockpiling, transporting and dispose of contaminated soil l. Dewatering m. Column and top steel to have oxide prime coating n. Provide gutters/scuppers to direct rainwater to the low side of the canopy o. Contractor shall maintain access and the ability to fuel large vehicles such as, Fire Tower Trucks and other large vehicles. p. Footing design to meet applicable wind loading. q. Related requirements in other parts of the Contract Documents: General and Supplementary Conditions of the Contract for Construction. r. The facility will shut down during construction, alternative fueling will be available for employees during this time.

Details

Division 13 - Special Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents