Similar Projects
D128 Summer HVAC Upgrades at Libertyville HS
Bidding
Libertyville, IL 60048

N041--25 Ton Chiller Replacement
Post-Bid
North Chicago, IL

HVAC Preventative Maintenance for Lake County Public Works Facilities and the City of Waukegan
Term Contract
Post-Bid
Libertyville, Waukegan, IL 60048

2020 Community Center HVAC Replacement
Results
Lake Zurich, IL 60047

Trainer and Dark Room 2020 HVAC Upgrades at Libertyville HS
Results
Libertyville, IL 60048

Re-Bid Insulation Repair Services For Plumbing And Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL 62701

Building 310 Exhaust Fan
Results
Gurnee, IL

2020 HVAC Preventative Maintenance Services
Term Contract
Post-Bid
Fox Lake, IL

2021 HVAC Upgrades Diamond Lake School
Results
Mundelein, IL

HVAC and Mechanical Products
Term Contract
Post-Bid

Leisure Center HVAC Roof-Top Unit
Results
Zion, IL 60099

2021 HVAC Upgrades at Antioch Community HS
Post-Bid
Lake Villa, IL

2021 Rooftop Unit Replacement
Post-Bid
Antioch, IL 60002

Rooftop Solar Panel Installation and Operations
Post-Bid
Highland Park, IL 60035

2021 HVAC Improvements at Rondout ES
Post-Bid
Lake Forest, IL 60045

Last Updated 09/02/2020 02:41 PM
Project Title

Range Ventilation System Replacement

Physical Address View project details and contacts
City, State (County) Vernon Hills, IL 60061   (Lake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition, relocate all items/equipment within range that need to remain but are not compatible with new range ventilation equipment drawings and specifications, increase roof openings as needed and reinforce openings as needed, reinforce roof as needed to support weight of new equipment, install all new equipment, ductwork, insulation, install all new controls, control wiring, field control devices, pneumatic tubing, reconnect all line voltage as needed at correct capacity, reconnect natural gas piping as needed at correct capacity, install new acoustical lay-in ceiling and constant down slope.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents