Similar Projects
Victim Services - HVAC Replacement
Term Contract
Bidding
$256,375 est. value
West Palm Beach, FL 33407

Central Energy Plant - Cooling Tower Reconditioning
Alteration
Bidding
$300,000 est. value
West Palm Beach, FL 33401

South County Admin - HVAC Replacement
Term Contract
Post-Bid
Delray Beach, FL 33445

EOC - HVAC Controls Upgrade
Term Contract
Post-Bid
West Palm Beach, FL 33415

HVAC Replacement at Vehicle Maintenance Building
Results
FL

Air Conditioning Monthly Maintenance - Annual Contract
Term Contract
Results
Royal Palm Beach, FL 33411

WUD SRWRF - Bldg. A, J, & JJ HVAC Replacements
Alteration
Bidding
Boynton Beach, FL 33437

Belle Glade Office Building - HVAC Replacement
Term Contract
Post-Bid
Belle Glade, FL 33430

N041--Air Curtains Remove and Install West Palm Beach Medical Center
Results
Riviera Beach, West Palm Beach, FL 33410

WUD Southern Region Water Reclamation Facility (SRWRF) - Building A, J and JJ HVAC Replacements
Alteration
Bidding
$50,000 est. value
Boynton Beach, FL 33437

A/C Maintenance and Repairs, Term Contract
Term Contract
Post-Bid
FL

Chilled Water Treatment Services
Term Contract
Results
Palm Beach, FL

Central Detention Center, Z Building - HVAC Replacement
Alteration
Bidding
$125,000 est. value
West Palm Beach, FL 33411

HVAC and Mechanical Products
Term Contract
Post-Bid

Town Hall Chiller and BCU Replacement
Results
Less than $325,000 est. value
Jupiter, FL 33458

Reported 05/20/2022 12:00 AM
Project Title

PBSO, Motor Pool - Chiller and Make-up Air Replacement

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL 33406   (Palm Beach County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency - 03/25/22
Owner View project details and contacts
Architect View project details and contacts
Description

To furnish all material, labor, supervision, permits and supplies necessary and reasonably incidental to replace chiller per the project requirements provided by Capital Improvements Division. to provide and install a new, Trane Air Cooled Chiller and Trane Make-Up Air Unit, or PBC approved equal. The MUA shall include stand-alone controls interface and devices, a new 3- way cooling valve, new rooftop intake with double-walled sheet metal ductwork to the unit. Modify existing chilled water piping to include full-size temporary cooling taps and provide a temporary chiller as needed to prevent disruption of service. Replace all accessories in the chiller yard to include but not limited to new combination disconnect motor starters for chilled water pumps. Air separator, expansion tank, Make-Up water regulator, all valves, checks, air vents, strainers, etc. interconnecting piping shall be modified as needed and insulated with new aluminum jacketed foam glass in the same manner as existing from the chiller to exterior wall penetration.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Packaged Water Chillers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents