Similar Projects
RFP Design - Design and Construction of Mckee Run Control House
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Dover, DE 19904

Puncheon Run Transmission Bypass - Kent County
Infrastructure
Conception
$2,600,000 CJ est. value
Dover, DE 19904

Smyrna Farmers Market
Demolition, New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Smyrna, DE 19977

Early Childhood Innovation Center New Building (ECIC)
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Dover, DE 19901

GSS Food Service Warehouse
New Construction, Infrastructure - 28,800 SF
Bidding
$4,500,000 CJ est. value
Smyrna, DE 19977

Calvary Baptist Church / Dover
New Construction, Infrastructure - 27,000 SF
Post-Bid
$9,000,000 CJ est. value
Dover, DE 19904

Laboratory Expansion - Bid Package 2: Steel, Carpentry, General Work
Addition, Demolition, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Smyrna, DE 19977

Towers Beach Parking Lot Renovations
Infrastructure
Results
Dover, DE 19901

Delaware Veterans Home Dental Suite Addition and Renovations
Addition, Demolition, Renovation, Infrastructure - 7,500 SF
Results
$249,500 CJ est. value
Milford, DE 19963

Chase Bank Branch / Dover
New Construction, Infrastructure - 3,480 SF
Construction
$1,300,000 CJ est. value
Dover, DE 19901

1165 South DuPont Boulevard Mixed Use Development
New Construction, Infrastructure - 57,600 SF
Pending Verification
$15,000,000 CJ est. value
Smyrna, DE 19977

1165 South DuPont Boulevard Mixed Use Development
New Construction, Infrastructure - 57,600 SF
Pending Verification
$15,000,000 CJ est. value
Smyrna, DE 19977

Critical Capital Needs/Deferred Maintenance - Delaware Technical Community College
Addition, Demolition, Infrastructure, Renovation
Conception
$33,451,000 CJ est. value
Dover, DE 19904

Townsend Building Exterior ADA Upgrades
Infrastructure
Bidding
$100,000 CJ est. value
Dover, DE 19901

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Last Updated 12/15/2023 12:07 PM
Project Title

Senator Bikeway Phase III, Mifflin Road to DHS

Physical Address View project details and contacts
City, State (County) Dover, DE 19904   (Kent County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $624,408 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The improvements consist of furnishing all labor and materials to include the design and construction of a bike/ped pathway along RT8 from Mifflin Road to Dover High School. The pathway will be an extension of the Senator Bikeway and make the connection to DHS. The pathway is proposed to be 8' wide. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer. Location: kent county These improvements are more specifically shown on the location map(s) of the attached plans. Pre-bid meeting: no Completion time: all work on this contract must be complete within 53 calendar days. Extensions of contract time due to weather are specified in the standard specifications section 108.7f, weather days. It is estimated a notice to proceed is issued such that work starts on or about december 18, 2023. Questions: e-mail to; dot-ask@delaware.Gov Questions regarding this project are to be e-mailed to the above address no less than six business days prior to the bid Opening date in order to receive a posted response. Surety bond - each proposal must be accompanied by a deposit of either surety bond or security for a sum equal to at least 10% of the amount bid. Performance-based rating system - 29 del.C. 6962 (c)(12)(a) requires deldot to include a performance-based rating system for contractors. The performance rating for each contractor shall be used as a prequalification to bid at the time of bid. Refer to 'general notices' for details. DEDOT - Senator Bikeway Phase III, Mifflin Road to DHS

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents