Similar Projects
Z2NE--NRM PLUS UP; (PROJ: 546-19-102) BB CONST; Upgrade Water Mains Building 1
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Miami, FL 33125

Homestead Air Reserve Base Completion Project Outdoor Fitness Facility
New Construction, Infrastructure - 2,000 SF
Bidding
$100,000 CJ est. value
Homestead, FL 33039

Emergency Culvert Replacement at NW 57 Avenue and NW 186 Street - Tropical Storm ETA
Post-Bid
Less than $206,557 est. value
FL

Furnish and Install 16-Inch Pvc 14-Inch HDPE ForceMain at N.E. 183Rd Road Street & Island Blvd
Post-Bid
$3,667,495 est. value
FL

North Cruise Boulevard Extension Phase III
Results
Less than $11,834,424 est. value
Miami, FL

Madeleine Village Apartments Seawall Replacement
Results
Less than $530,000 est. value
Miami Beach, FL 33139

Gateway Commerce Park - Phase 2
New Construction
Construction
Miami Gardens, FL

Bay Harbor Drive Condominiums
Demolition, New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Bay Harbor Islands, FL 33154

Bay Harbor Drive Condominiums
Demolition, New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Bay Harbor Islands, FL 33154

Roadway Improvements to SW 22 Avenue from US-1 to Coral Way
Post-Bid
$559,425 est. value
Miami, FL 33010

Beach Erosion Control and Hurricane Protection Project Bal Harbour Beach Renourishment 2020 Miami-Dade County, Florida
Results
$10,000,000 to $20,000,000 est. value
Miami, FL

Charles Deering Estate Courtyard Drainage and Structural Improvement
Post-Bid
Miami, FL 33157

Design and Construction of Concrete Hurricane-Resistant Screen Wall at Miami Job Corps Center
Results
$250,000 to $500,000 est. value
Miami Beach, FL 33056

Construction Services for a Roadway Improvement
Post-Bid
Miami Shores, FL 33150

Design-Build Services for Roadway Improvements to NE 2nd Avenue
Results
Less than $10,307,626 est. value
Miami, FL 33128

Last Updated 07/28/2022 10:08 AM
Project Title

Northwest 58th Street Outfall

Physical Address View project details and contacts
City, State (County) Doral, FL 33178   (Miami-Dade County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $967,688 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Doral desires to retain the services of a qualified and licensed Contractor, or a Certified Engineering Contractor to construct stormwater drainage improvements along NW 57th Street between NW 79th Avenue and NW 78th Avenue (Known as Phase I) and along NW 79th Avenue between NW 57th Street to NW 58th Street to construct along the NW 58th Street canal bank a 48" Outfall to discharge from the south bank of the NW 58th Street Canal (Known as Phase I). Roadway restoration and milling & resurfacing is required for this project. Also, canal bank improvements of pond 1 and pond 2 of NW 58th Street Canal to improve the top of bank of each canal segment to reach historical flood elevations. For a more detailed project overview refer to the attached construction plan set titled "Sub Basin H-5 NW 58th Street Canal and Outfall Improvements." All questions and/or comments should be directed to Procurement at the following email at procurement@cityofdoral.com. All inquiries must reference "ITB No. 2022-22 NW 58th Street Outfall" in the subject line. No phone calls will be accepted in reference to this ITB. Question Deadline 07/07/2022 at 5:00 PM ET Any communications regarding matters of clarification must be made in writing to the email address listed above. If it becomes necessary to provide additional clarifying data or information that revises any part of this ITB, supplements or revisions will be made available via written addendum. EAC Project No. 20067.LD01-04, CLIII 2021-0017, 17077.WW01-06 Phase I - 467,808 Phase II - 499,880

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents