Last Updated 02/10/2021 07:00 AM
Project Title

Preservation - District 6

Physical Address View project details and contacts
City, State (County) (Beaufort, Jasper Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Borrow Excavation 255.500 Cy Maintenance Stone 7.000 Ton Liquid Asphalt Binder Pg76-22 288.071 Ton Full Depth Asph. Pav. Patching 6" Unif. 700.000 Sy Milling Existing Asphalt Pavement (Variable) 3,324.000 Sy Milled-In Rumble Strip 9.340 Mi Hot Mix Asphalt Surface Course Type e 4,431.854 Ton Permanent Construction Signs (Ground Mounted) 586.280 Sf 4" White Broken Lines(Gaps Excl.)Perm.Pvmt.Marking 700.000 Lf 6" White Broken Lines(Gaps Excl.)Perm.Pvmt.Marking 66.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Perm.Pvmt.Marking 59,157.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Perm.Pvmt.Marking 560.000 Lf 8" White Solid Lines Perm.Pvmt.Markings 199.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Perm.Pvmt.Marking 127.000 Lf White Single Arrows (Lt, Strght, Rt) Perm.Pvmt.Marking 10.000 Ea White Word Message "Only" -Perm.Pvmt.Marking 10.000 Ea 4" Yellow Broken Lines(Gaps Exc)Perm.Pvmt.Marking 4,290.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Perm.Pvmt.Marking 38,492.000 Lf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 1,400.000 Lf 6" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 132.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 118,314.000 Lf 6" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 1,120.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 398.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 254.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 20.000 Ea White Single Bike Lane Arrow (Lt, Straight, Rt)-Fast Dry Paint 2.000 Ea White Word Message "Only"-Fast Dry Paint 20.000 Ea Bike Lane Symbol - Fast Dry Paint 2.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 8,580.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 76,984.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 524.000 Lf Bike Lane Symbol -Preformed Thermo - 60mil 1.000 Ea Bike Lane Arrow - Preformed Thermo - 60mil 1.000 Ea Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 83.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 102.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 418.000 Ea Removal Of All Pavement Markings 11.290 Lm

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents