Similar Projects
Yerico Manufacturing Warehouse
New Construction, Infrastructure - 30,000 SF
Design
$2,500,000 CJ est. value
Elgin, TX 78621

Yerico Manufacturing - Manufacturing Space & Accessory Office
New Construction, Infrastructure - 20,064 SF
Design
$4,000,000 CJ est. value
Elgin, TX 78621

FM 1100 - Resurface Roadway
Infrastructure
Bidding
$394,167 CJ est. value
Elgin, TX 78621

FM 1100 - Resurface Roadway
Infrastructure
Bidding
$394,167 CJ est. value
Elgin, TX 78621

RFQ Construction Manager at Risk - MD Anderson Cancer Center Comparative Medicine and Research Building Expansion
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$35,000,000 CJ est. value
Bastrop, TX 78602

FM0535 - Seal Coat Aggregate (Material Only)
Term Contract
Sub-Bidding
$1,642,258 CJ est. value
Rosanky, TX 78953

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Asphalt Cold Mix D Asppm Grade 4 High Performance Asphalt to Include Delivery
Infrastructure
Post-Bid
Elgin, TX

2021 Group Seal Coat Program
Results

Emulsified Asphalt
Term Contract
Results
Bastrop, TX

Bastrop Rapid Express / Rapid Express Car Wash
New Construction, Infrastructure - 4,000 SF
Pending Verification
$1,500,000 CJ est. value
Bastrop, TX 78602

Bastrop Rapid Express / Rapid Express Car Wash
New Construction, Infrastructure - 4,000 SF
Pending Verification
$1,500,000 CJ est. value
Bastrop, TX 78602

Southside Market Headquarters
New Construction, Infrastructure - 5,000 SF
Design
$1,000,000 CJ est. value
Elgin, TX 78621

The Colony MUD 1C Section 2 Rosewood Path Extension
Infrastructure
Bidding
$547,869 CJ est. value
Bastrop, TX 78602

East Construction of Sitework, Fencing, Planting and Irrigation
Alteration
Post-Bid
Bastrop, TX

Last Updated 10/06/2022 10:26 AM
Project Title

Hot Mix and Fog Seal Services

Physical Address View project details and contacts
City, State (County) Bastrop, TX 78602   (Bastrop County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $437,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Question Deadline 10/11/2022 at 5:00 PM CT Questions about the technical nature of the Scope of Services, etc. may be directed to Bastrop County Purchasing Agent, Leon Scaife through e-mail at leon.scaife@co.bastrop.tx.us Bastrop County is requesting a bid for Hot Mix and Fog Seal Services. Bastrop County has a need for TxDOT Item 340 and Item 315 (Dense-Graded Hot-Mix Asphalt and Emulsified Asphalt Seal) to be placed in various locations throughout Bastrop County on an as needed basis. TxDOT Item 340 may require a Hot Mix overlay (1 Compacted - Minimum) with a TxDOT prime to be placed prior to Hot Mix. Materials/Mix Design to be approved by the Bastrop County Engineer. TxDOT Item 340 may require a Thin Hot Mix overlay (1 Compacted) with a TxDOT prime to be placed prior to Hot Mix. Materials/Mix Design to be approved by the Bastrop County Engineer. Some areas will require a Fog Seal (TxDOT Item 315). Materials/Mix Design to be approved by the Bastrop County Engineer. The County reserves the right to withdraw this RFB for any reason. The CONTRACTOR IS REQUIRED to furnish a good and sufficient bid bond or a cashiers check in the amount of five percent (5%) of the total bid submitted in response to this request. A bid bond must be executed with a surety company authorized to do business in the State of Texas. The bid bond of the awarded contractor is subject to forfeiture in the event the successful bidder fails to execute all requirements set forth in the contract documents within ten days after the contract has been awarded. Payment and Performance bonds shall be required and issued for this contract should the total bid price reach the State of Texas threshold for public works projects. The contractor agrees that within ten (10) days after a work order is issued and sent to them by Bastrop County, a Payment Bond will be executed and delivered to Bastrop County for the amount of one hundred percent (100%) of the estimated contract total, should the contract total meet and/or exceed twenty-five thousand dollars ($25,000). A Performance bond in an amount of one hundred percent (100%) of the estimated contract price should also be executed and delivered to Bastrop County should the contract amount meet and/or exceed one hundred thousand dollars ($100,000). The Performance and Payment Bond must be maintained throughout the contract execution period

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents