Similar Projects
Rozsa Center Lobby Flooring and Painting
Alteration
Bidding
Houghton, MI

2021 Fire Hydrant Blasting and Repainting Project
Term Contract
Bidding
Oak Park, MI

WCCCD Curtis L. Ivery Downtown Campus Restoration and Painting
Post-Bid
Detroit, MI

Exterior Painting Of Historical Courthouse
Post-Bid
Saint Joseph, MI

Painting Services
Term Contract
Results
Wayne, MI 48184

Water Tank Painting
Results
Grandville, MI

Fiedler Elementary Parking Expansion Acoustic Panels/Painting
Post-Bid
Flint, MI

Exterior Improvements - Bid Package 20
Results
Plymouth, MI

Stadium Deck Coating
Post-Bid
Saint Joseph, MI

Painting and Power Washing Service
Term Contract
Results
Detroit, MI 48226

Symbol Painting
Post-Bid
Traverse City, MI

Golf Course Maintenance Building Roof Coating Project 2020
Results
Saint Clair Shores, MI

Midland Public School 2020 Painting
Post-Bid
Midland, MI

Painting of Striping of Various Parking Areas, Crosswalks and Legends
Results
Traverse City, MI 49684

Vehicle Maintenance Garage Interior Painting Project
Post-Bid
New Haven, MI

Last Updated 07/08/2021 09:43 AM
Project Title

Lakes House Grill Bar and Restroom Painting

Physical Address View project details and contacts
City, State (County) Taylor, MI 48180   (Wayne County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Prep all areas, make any needed repairs and pair with two coats of paint. All Measurements listed are estimates, contractor is responsible to measuring items to be painted. 2. Bar Area Approx. 2400 Sq Ft Outlined in Pink (Must be Completed on Weekend) 1. Remove all pictures 2. Patch and prep all painted surfaces 3. Apply paint to all painted surfaces Bathrooms/Storage Area Approx. 1500 Sq Ft Outlined in Blue (Completed any Time) 1. Remove all wall covering 2. Prep walls for paint 3. Paint all walls in both the hallway and the restrooms Wall Radiators. 1. Prep all painted surfaces 2. Apply paint to all painted surfaces

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents