Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

MATOC IDIQ for Control Systems Installations at Hydroelectric Facilities for The U.S. Army Corps of Engineers, South Atlantic Division
Term Contract
Post-Bid
Less than $20,000,000 est. value

Preventative Maintenance Service for Data Center Battery Backup System
Term Contract
Post-Bid
Gainesville, FL 32609

Doyle Conner Building Generator Addition
Alteration
Results
Gainesville, FL 32608

Annual Generator Maintenance, Inspection, Repair and Emergency Rentals for General Government Buildings
Term Contract
Results
Gainesville, FL

Thermal Utility System Improvements
Construction
Gainesville, FL 32611

Storm Rates Overhead Line Construction 2022
Infrastructure
Post-Bid

NPS, Liebert UPS Semi Annual Maintenance
Term Contract
Results
Homestead, FL 33030

3 Yr Electrical Maintenance and Test
Term Contract
Post-Bid
Gainesville, FL

SERVICES: 3-Year Electrical System Maintenance, Inspection, and Testing of the Electrical Power Distribution System
Term Contract
Results
Gainesville, Lake City, FL 32608

Upgrading Wooden Utility Poles
Term Contract
Post-Bid
Gainesville, FL 32601

138Kv Ring Bus Project
Alteration
Results
Gainesville, FL

FY23 Service Contract Emergency Generator Maintenance
Term Contract
Post-Bid
Gainesville, FL 32608

Buchholz High School Auditorium Renovations
Alteration
Results
$651,000 est. value
Gainesville, FL 32606

General Service Agreement (GSA) for Electrical Contractor
Term Contract
Post-Bid
Gainesville, FL 32601

Last Updated 02/01/2023 12:01 PM
Project Title

230/138 kV Autotransformer

Physical Address View project details and contacts
City, State (County) Gainesville, FL 32608   (Alachua County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $20,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Gainesville Regional Utilities (GRU) is seeking contractors for the purpose of delivery, assembly and testing for two (2) 230 kV to 138 kV autotransformers at the Parker substation. The transformer shall be outdoor station type complete with oil. It shall be a single winding auto transformer, self-cooled at the base rating with two stages of forced air cooling. Use of forced oil cooling is not acceptable for any cooling stage. The two transformers in Attachment 3, Technical Specifications shall be designed to operate in parallel with each other. Each transformer shall be manufactured and tested at a facility within the U.S.A. Question Deadline 11/16/2022 All questions about the meaning or intent of the Solicitation are to be directed to the Purchasing Representative, unless stated otherwise in the Solicitation. Bid Bond Required

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents