Similar Projects
SR 826/Palmetto Expressway Capacity Improvement Project (FPID)
Bidding
Miami Lakes, FL 33014

Resurfacing
Bidding
$6,024,990 est. value
FL

Construction of Lincoln Road District Improvements
Post-Bid
Miami Beach, FL

Miami Circle
Post-Bid
Miami, FL 33131

Roadway Improvements Project - Northeast 125th Street
Results
North Miami, FL 33161

Miscellaneous Roadway and Drainage Improvements
Results
Cutler Bay, FL 33189

Intersection Improvement
Bidding
$4,726,324 est. value
FL

DMS Courtyard Replacement
Post-Bid
Miami, FL 33128

Stormwater Management System Prevent Maintenance
Term Contract
Results
Sunny Isles, FL 33160

Railroad Intersection Improvement
Bidding
$34,326,701 est. value
FL

Jackson North Medical Center Asphalt Repairs (SBE Set Aside)
Post-Bid
Less than $50,000 est. value
Miami, FL 33169

Push Button Roadway Resurfacing-North
Results
Less than $1,620,984 est. value
Miami, FL

Push Button Intersection Improvements-North
Bidding
$1,583,934 est. value
FL

Rickenbacker Causeway Green Bike Lanes Segment A - Phase I
Post-Bid
Less than $1,950,000 est. value
Miami, FL 33128

Push Button Roadway Resurfacing- South
Results
Less than $1,620,984 est. value
Miami, FL

Last Updated 02/10/2020 10:21 AM
Project Title

West Lakes Drainage and Roadway Improvements Project

Physical Address View project details and contacts
City, State (County) Miami Lakes, FL 33014   (Miami-Dade County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,280,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Stormwater Master Plan identified the West Lakes area as a priority for stormwater improvements. The Project consists of constructing approximately 2,063 linear feet of drainage pipe and 6,790 linear feet of exfiltration trenches (French Drains), connecting to the stormwater main line on NW 89th Avenue leading to an outfall. The Project will also consist of performing restoration and asphalt resurfacing of the existing roadway surfaces impacted by the drainage improvements to increase drainage capacity, reduce localized flooding, improve stormwater runoff, and mitigate local mosquito populations. The Project encompasses four (4) areas of priority, also referred to in the Town of Miami Lakes Stormwater Master Plan as Areas B, C, D, and E.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents