Similar Projects
S Jackson Avenue and Barrett Drive Reconstruction
Post-Bid
Justin, TX 76247

Liberty Trails - Phase 1B Paving Improvements
Post-Bid
TX

Driveway Resurface Project
Results
$100,000 to $250,000 est. value
Denton, TX 76209

Harvest Townside Phase 2 Paving
Results
TX

US 377 and Arvin Hill Intersection Project
Post-Bid
$948,000 est. value
Denton, TX 76201

Harvest Townside Phase 2 Mass Grading
Results
TX

Commercial Access Drive
Post-Bid
Hickory Creek, TX 75065

Southern Region Disaster Recovery Support BPA
Results

Lake Ralph Hall Roadway Relocations Project
Post-Bid
Lewisville, TX 75067

Paving Improvements for Aspen Meadows Phase 1
Results
Denton, TX 76201

Pecan Square Phase 2B-1 Improvements Paving, Signage, and Lighting
Post-Bid
Northlake, TX

2019 Residential Streets
Results
$1,102,040 est. value
Bartonville, TX

Paving, Signage, and Lighting Infrastructure for Pecan Square Phase 2B-2
Post-Bid
Northlake, TX

Tire Rubber Modified Asphalt
Term Contract
Results
$333,000 est. value
Denton, TX

Paving, Signage, and Lighting Infrastructure for Pecan Square Phase 2B-3
Post-Bid
Northlake, TX

Last Updated 04/12/2021 03:56 PM
Project Title

Waketon Road (Cross Timbers Drive to 1,350` East of Chinn Chapel)

Physical Address View project details and contacts
City, State (County) Flower Mound, TX 75028   (Denton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,820,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of furnishing all labor, equipment and materials (except as otherwise specified), and performing all work necessary for the construction of storm drain systems, concrete pavement, sidewalks, roundabout, and waterline lowerings as detailed in the construction plans and specifications. The Waketon Road project is located on Waketon Road from Cross Timbers Drive to 1,350' East of Chinn Chapel.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents