Similar Projects
Northern Boulevard Expansion Phase II
Bidding
Rio Rancho, NM

Construction services for White Sands Village
Bidding
Pojoaque, NM

Roadway Construction and Storm Drainage
Post-Bid
Bernalillo, NM 87004

Valle de Oro Outlet Structure
Post-Bid
$2,600,000 est. value
Albuquerque, NM 87107

SWNARRC - Demo and Construct Pond Kettles
Demolition
Results
$1,000,000 to $250,000 est. value
Dexter, NM 88230

Z--Installation of Continuous Channel Drain for Water
Results
$25,000 to $100,000 est. value
Kirtland, NM

Fairgrounds Drainage and ADA Compliance Plan
Post-Bid
Portales, NM

Calle Baack Roadway and Drainage Improvements
Results
Bernalillo, NM 87004

Copper King Trail Improvements
Post-Bid
Red River, NM 87558

City Wide Pond Maintenance
Results
Albuquerque, NM

Altura Avenue Phase III Infrastructure Improvements Project
Post-Bid
Columbus, NM 88029

Arroyo Flood Control Authority (Sscafca) Lisbon Channel Improvements Project
Results
Less than $400,242 est. value
Rio Rancho, NM 87124

Restore Some Retention Dams and Erosion Control Structures
Post-Bid
Cuba, NM 87013

Vado West Floodplain Repair
Term Contract
Results
$1,000,000 to $5,000,000 est. value
NM

Non-Point Source Pollution Prevention Project for the Santa Clara Creek Watershed - 2020
Post-Bid
Espanola, NM 87532

Last Updated 12/04/2019 02:31 PM
Project Title

Rio Rancho Sports Complex Erosion Control Project

Physical Address View project details and contacts
City, State (County) Rio Rancho, NM 87124   (Sandoval County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rio Rancho Sports Complex Erosion Control project to stabilize approximately 1,500 linear feet of the bank of the Los Montoyas Arroyo at the Rio Rancho Sports Complex constructing a two to one slope and directly applying non-structural concrete slope paving. It will extend from an average of 8'-8" below the invert of the arroyo to a height of 10' above the invert of the arroyo. Exposed fill above the slope paving will be stabilized using a geosynthetic fabric with native seeding.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents