Similar Projects
Depot Street - North Warehouse
New Construction - 211,600 SF
Conception
Bellingham, MA 02019

M.Coelho Masonry Landscaping
New Construction - 5,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Bellingham, MA 02019

CAT Commercial Equipment
New Construction - 37,000 SF
Design
Stoughton, MA 02072

Sparhawk Academy
New Construction - 8,000 SF
Design
Millis, MA

Roxbury Prep Washington Street Campus Alterations
Renovation
Post-Bid
$100,000 est. value
Boston, MA 02119

Public Storage #26604
Renovation
Post-Bid
Weymouth, MA 02188

Michael Driscoll School Project - Filed Sub Bids
New Construction - 157,950 SF
Results
$92,800,000 est. value
Brookline, MA 02446

South Middle School - General Bids
New Construction - 145,850 SF
Results
$72,331,417 est. value
Braintree, MA 02184

Self Storage Facility
New Construction - 123,000 SF
Construction
Needham, MA 02192

Pacella Park Road Industrial Building
New Construction - 37,500 SF
Construction
$60,000 est. value
Randolph, MA 02368

Atlantic Mechanical Expansion
New Construction - 2,500 SF
Pending Verification
$175,000 est. value
Weymouth, MA 02189

Globe Composite Solutions Expansion
Addition - 80,000 SF
Pending Verification
$10,000,000 est. value
Stoughton, MA 02072

Self Storage Facility
New Construction
Design
Stoughton, MA 02072

Interior Renovations to the Dental Assisting Suite at Madison Park Technical Vocational High School
Renovation
Post-Bid
Boston, MA

South Middle School - Filed Sub Bids
New Construction - 145,850 SF
Results
$72,331,417 est. value
Braintree, MA 02184

Last Updated 06/22/2022 09:11 AM
Project Title

Steel Building Erection

Physical Address View project details and contacts
City, State (County) Franklin, MA   (Norfolk County)
Category(s) Commercial, Education
Sub-Category(s) Middle/Senior High School, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $120,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Star steel building system purchased by the school district and needs to be erected per manufacturer's standards. Experience with Star buildings preferred.

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents