Similar Projects
I-285 WB Ashford Dunwoody Road Ramp Extension
Post-Bid
GA

Centralhatchee Parkway Sidewalk
Post-Bid
Centralhatchee, GA

Blakely Gateway Project
Results
$700,000 est. value
Blakely, GA 31723

Jesters Creek Trail Phase III
Results
Morrow, GA 30260

CVS #4717 Partial ADA Project
Renovation
Construction
$38,000 est. value
Atlanta, GA 30311

Construction Management Services for North Oconee River Greenway
Post-Bid
Less than $2,000,000 est. value
Athens, GA 30603

St. Marys FY 2020 LMIG Project
Results
Saint Marys, GA 31558

Lincoln and Washington Street Resurfacing
Post-Bid
Metter, GA 30439

Tarboro Fire Station 18 Parking Lot
Results
White Oak, GA 31568

Col/Wynne Russell-West Johns Sidewalk
Post-Bid
Lilburn, GA

Jekyll Island Beach Crossover Construction
Results
Brunswick, GA 31527

4th Street Extension/Griffin Street Safety Improvements
Post-Bid
Guyton, GA 31312

Ocmulgee Heritage Trail Connector
Results
Macon, GA 31201

Tree Root Damage Repair
Term Contract
Post-Bid
Savannah, GA

Baymeadows Drive Pedestrian Improvements
Results
Less than $274,869 est. value
Valdosta, GA 31601

Last Updated 03/15/2022 09:28 AM
Project Title

Phase II and III Radium Concrete Trails

Physical Address View project details and contacts
City, State (County) Albany, GA   (Dougherty County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The Scope of this project is to furnish all labor, tools, materials (unless otherwise stated) and equipment necessary for the installation of approximately 12,600 LF of 10’ and 12’ wide concrete trails at locations in the Radium Springs area. The trails will connect to existing trail segments in the area. The contractor is expected to provide any required grading and compaction necessary to achieve final design elevations. The Contractor will also be responsible for backfilling from the edge of the concrete trail out to a minimum of 5 feet and tie into the natural ground.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents