Similar Projects
Van Dyke Center
New Construction
Conception
Rogers, AR 72756

Helios Storage
New Construction - 33,465 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Hot Springs, AR 71901

ATHC
New Construction - 3,350 SF
Design
$1,000,000 est. value
Little Rock, AR 72204

Martin Dingman
New Construction - 24,000 SF
Bidding
Omaha, AR 72662

Bennett Office Space - Edward Jones #63125
Renovation, Addition - 1,145 SF
Post-Bid
Searcy, AR 72143

Mountain Home Swim Beach Repair
Renovation
Post-Bid
Little Rock, AR 72201

General Contractor for a Maintenance Building
New Construction - 36,000 SF
Results
Bentonville, AR

Arkansas Union Tenant Infill
New Construction
Results
Fayetteville, AR

Peloton Office
New Construction
Construction
Bentonville, AR

Modern Storage
New Construction - 74,200 SF
Construction
Bryant, AR 72022

Arkansas Systems Office Park
New Construction
Pending Verification
Little Rock, AR

Stratice LLC
Renovation - 902 SF
Pending Verification
Bentonville, AR 72712

Chandler Equipment Expansion
Addition - 26,273 SF
Design
Springdale, AR 72762

Zoo Membership Office Renovation
Renovation
Post-Bid
Little Rock, AR 72205

District 2 r.e. Office 23 (Pine Bluff) (s)
New Construction
Results
AR

Reported 11/09/2021 12:59 PM
Project Title

Rogers Group

Physical Address View project details and contacts
City, State (County) Conway, AR 72032   (Faulkner County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method General Contractor to Subcontract.
Project Status Contract Award
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This bid(s) requires sealed separate bids.

Details

5,843 SF - Office, 1 Story Above Grade, 1,989 SF Addition, 1 Office, 1 Story Above Grade, 3,854 SF Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents