Similar Projects
Roof Repairs and Replacement of Various County Buildings - Hurricane Damage
Bidding
Bay Minette, AL

Senior Center Roof Project
Post-Bid
Daphne, AL 36526

Roofing Repair and Maintenance
Post-Bid

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Fire Hall Roof Repairs
Post-Bid
Fairhope, AL 36532

Labor and Incidental Materials for Roof Replacement and Maintenance to Various County Buildings
Results
Bay Minette, AL 36507

Founders Park Roof Repair
Post-Bid
Fairhope, AL 36532

Fire Station 2 Roof Replacement
Results
Less than $98,000 est. value
Gulf Shores, AL 36542

CAA Roof Renovation
Post-Bid
Daphne, AL 36526

Replace Roofs on Anderson Boulevard Apartments
Results
Bay Minette, AL 36507

New Roof and Gutters Replacement for PW/PU Admin Bldg FEMA 4563
Alteration
Post-Bid
Fairhope, AL

Hurricane Sally Roofing Repairs
Results
Orange Beach, AL 36561

Cultural Center Hurricane Sally Roof and Structure Repairs
Results
Less than $480,000 est. value
Gulf Shores, AL 36542

Former USA Building Roof Replacement
Results
Less than $27,650 est. value
Fairhope, AL 36532

Reported 06/21/2021 11:40 AM
Project Title

North Beach Pavilion Repair and Replacement of Asphalt Shingle Roof

Physical Address View project details and contacts
City, State (County) Fairhope, AL 36532   (Baldwin County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work is to repair and replace the composite asphalt shingle roof on the Picnic Pavilion. Work shall include, but not be limited to the following: • Remove Existing Shingles and Felt to Decking • Inspect, Remove and Replace any Bad Decking as needed • Re-nail decking per code (See Attached) • Install Deck Tape on Plywood Laps per code (wind and water shield) • Install New Underlayment per code (wind and water shield) • Install New drip edge, eve/valley metal Trim Package (as applicable) • Install new GAF Timberline 30-year shingles (or equivalent) – owner to select color • Install new Ridge Vent, Ridge Cap, Wall Flashings and Pipe (vent) Boots (as applicable) • Clean, Haul and Dispose of all job-related debris.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Built-Up Bituminous Roofing, Built-Up Asphalt Roofing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents