Similar Projects
Walk-In Cooler/Freezer at Whiteaker Head Start Facility (Equipment Only)
Term Contract
Design
Eugene, OR 97402

Forest Grove Armory Building 1003 Demolition Project
Demolition, Infrastructure - 80 SF
Sub-Bidding
$165,000 CJ est. value
Forest Grove, OR 97116

Vehicle Inspection Program Remote Sensing
Alteration
Post-Bid
Oregon City, OR 97045

F--Willamette Valley (OR) BPA - Spray Equipment and Operator
Term Contract
Post-Bid
Corvallis, OR 97333

Englewood School Brownfield
Demolition
Results
Coos Bay, OR

Minivans, AWD
Term Contract
Results
Salem, OR 97317

Video Surveillance System Installation
Alteration
Post-Bid
Portland, OR 97232

Mulching Head Attachment for Excavator
Alteration
Results

Chevrolet Express Cargo Van
Term Contract
Post-Bid
Salem, OR 97317

Miscellaneous Brass Fittings
Alteration
Results
Salem, OR

Turn-Key 19.5, 22K & 33K GVW Bucket Trucks
Term Contract
Post-Bid
Portland, OR 97209

Loading Dock and Electrical Dock Repair at Oregon Convention Center
Renovation, Alteration - 8,000 SF
Results
$300,000 est. value
Portland, OR 97239

Headworks Screen Improvements Headworks Screen Procurement
Alteration
Post-Bid
$120,000 to $150,000 est. value
Union, OR

Purchase of Polymer Flocculent
Alteration
Results
Hillsboro, OR

Airport Passenger Jet Bridge Maintenance Services
Alteration
Post-Bid
Eugene, OR 97402

Last Updated 04/17/2023 08:23 AM
Project Title

Pump Station Rehabilitation and Upgrades Group 1 Project

Physical Address View project details and contacts
City, State (County) Oregon City, OR 97045   (Clackamas County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,137,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work contemplated under this contract with the Owner, includes all labor, materials, transportation,equipment and services necessary for, and reasonably incidental to, the completion of all construction work in connection with the project described in the Project Manual which includes, but is not necessarily limited to, the Notice of Public Improvement Contract Opportunity, Instructions to Bidders, Supplemental Instructions to Bidders, Bid Form, Bid Bond, Public Improvement Contract Form, Performance Bond, Payment Bond, Clackamas County General Conditions for Public Improvement Contracts (10/13/2021), Supplemental General Conditions, and Plans, Specifications and Drawings. 1018436 20.18.02 Procurement Process and Technical Questions: Tralee Whitley, twhitley@clackamas.us. Engineers Estimate: $1,288,200.00 Prevailing Wage Rates requirements apply to this Project because the maximum compensation for all Owner-contracted Work is more than $50,000. Contractor and all subcontractors shall comply with the provisions of ORS 279C.800 through 279C.870, relative to Prevailing Wage Rates. The Bureau of Labor and Industries (BOLI) wage rates and requirements set forth in the following BOLI booklet (and any listed amendments to that booklet), which are incorporated herein by reference, apply to the Work authorized under this Agreement: Clackamas County encourages bids from Minority, Women, and Emerging Small Businesses.

Details

Division 11 - Equipment, Operation and Maintenance of Equipment, Vehicle Service Equipment, Maintenance Equipment, Unit Kitchens, Residential Equipment, Residential Appliances, Agricultural Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents