Similar Projects
Robert Street Pedestrian-Bike Pathway - City of Cody
Infrastructure
Conception
$450,000 CJ est. value
Cody, WY 82414

Robert Street Pedestrian-Bike Pathway - City of Cody
Infrastructure
Conception
$450,000 CJ est. value
Cody, WY 82414

RFQ - Yellowstone, Grand Teton and Surrounding Area MATOC, 2024-2028
Term Contract
Bidding
$150,000,000 CJ est. value
Yellowstone National Park, WY 82190

RFQ - Yellowstone, Grand Teton and Surrounding Area MATOC, 2024-2028
Term Contract
Bidding
$150,000,000 CJ est. value
Yellowstone National Park, WY 82190

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

WY NPS Yell 10(23), Grand Loop Road - Old Faithful To West Thumb
Term Contract
Post-Bid
Yellowstone National Park, WY

District 5 Crack Seal
Infrastructure
Results

Rading, Bituminous Pavement Surfacing, Slide Stabilization Rock, Aggregate Columns, Temporary Concrete Barriers and Miscellaneous Work
Infrastructure
Results
WY

Rocky Mountain Granite
New Construction, Infrastructure - 5,000 SF
Pending Verification
$600,000 CJ est. value
Cody, WY 82414

Rocky Mountain Granite
New Construction, Infrastructure - 5,000 SF
Pending Verification
$600,000 CJ est. value
Cody, WY 82414

Infrastructure Improvements - East Sheridan Intersects with Beacon Hill Road
Infrastructure
Conception
$1,250,000 CJ est. value
Cody, WY 82414

RFP Construction Manager at Risk Services - Construction of Heavy Equipment Maintenance Shop Park County Powell Landfill
New Construction, Infrastructure
Bidding
$650,000 CJ est. value
Powell, WY 82435

Z--MATOC - IMR Bridges
New Construction
Post-Bid
$10,000,000 est. value

Grading, Milling Plant Mix, Bituminous Pavement Surfacing, Bridge Rehabilitation, Temporary Concrete Barrier, Guardrail And Miscellaneous Work
New Construction, Infrastructure
Results

Sweets Soda Shoppe
New Construction, Infrastructure - 502 SF
Pending Verification
$200,000 CJ est. value
Cody, WY 82414

Last Updated 01/31/2023 07:06 PM
Project Title

Ralston North (Badger Basin Section)

Physical Address View project details and contacts
City, State (County) Powell, WY 82435   (Park County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $5,622,824 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Number: W294005 County: Park District: District 5 Bid Items Version#: 001 Work Type: Chip Sealing Mill & Overlay Bituminous surfacing, traffic control, surfacing, chip seal, milling, grading, drainage, guardrail and miscellaneous work on approximately 9.80 miles on WYO 294 beginning at RM 0.009 just North of Ralson. The Department of Transportation places the responsibility for the delivery of the bids to the letting with the bidder. Bidders may elect to have their bids delivered by any delivery service, or may hand carry their bids to the above street address. Any bids received at the letting after 9:00 AM on the above date will be returned to the bidders unopened. WYDOT Resident Engineer: Todd Frost, P.E., Cody (307)587-2220 For questions regarding ICX bidding software, please contact Mark Janicek in the Contracts & Estimates office. Office number (307) 777-4214, Mobile: (307) 630-4727 (Available the day prior to and day of letting). In the event Mark is unavailable, please call Contracts & Estimates. Office number: (307) 777-4487. It is mandatory that all bids be prepared electronically using WYDOT Electronic Bid System (EBS) and a hard copy of the bid be Submitted. An electronic bid bond is preferred, in the amount of 10 percent of the total bid. In lieu of the electronic bid bond, a cashier's check payable to the Transportation Commission of Wyoming in the amount of 10 percent of the bid is acceptable. The Wyoming Department of Transportation reserves the right to reject any and all bids. Bid Consideration: Bids will be considered by the Transportation Commission of Wyoming, January 19, 2023. WYDOT - Call Order 004 -Ralston North (Badger Basin Section)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents