Similar Projects
Composite Coat Floors and Containment Basins at Water/Wastewater Plants
Post-Bid
Less than $750,000 est. value
Tampa, FL 33601

Halifax Health Port Orange Hospital Flooring
Post-Bid
Port Orange, FL 32127

Public Safety Building Repairs
Results
Less than $10,100 est. value
Callaway, FL 32404

Replace the Flooring for the Wewahitchka High School Commons Area
Results
Wewahitchka, FL 32465

Floor Sanding, Repairing and Finishing Package for Wickline Building Renovations
Post-Bid
Flagler Beach, FL

Concrete Floor Grinding
Results
$100,000 to $250,000 est. value
Marianna, FL

Flooring Carpet, Tile, Vinyl and Installation
Post-Bid
Bartow, FL 33831

Installation of Vinyl Tile at USCG Air Station Miami
Results
Opa-locka, FL

Monroe County Public Library, Marathon Branch and Adult Education Center Terrazzo Floors
Post-Bid
Less than $6,000 est. value
Marathon, FL 33050

Epoxy Floor Covering
Results
Saint Augustine, FL 32092

Halifax Health Port Orange Hospital - Flooring
Post-Bid
Port Orange, FL 32127

Bartram Trail Branch Library Flooring Replacement
Results
Less than $53,000 est. value
Fruit Cove, FL 32259

Flooring Installation Services
Post-Bid
Hialeah, FL 33010

Carpet Cleaning Services - Annual Contract
Term Contract
Results
FL

Floor Replacement - Mclarty Park Community Center
Post-Bid
Rockledge, FL 32955

Reported 05/18/2021 12:00 AM
Project Title

Airport Terminal Flooring Replacement Project Phase I

Physical Address View project details and contacts
City, State (County) Pensacola, FL 32504   (Escambia County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the replacement of floor covering in the Pensacola International Airport Terminal first floor selected areas and second floor mezzanine corridor. On the first floor of the terminal, the scope of work consists of removal of the existing carpeting and rubber base in the waiting areas in the airline ticketing area, behind the rental car service desks and respective offices, the baggage claim carousels, and a side vending room. On the second floor of the terminal, the mezzanine corridor to meeting rooms and Airport Administration offices, the scope of work consists of removing existing carpeting and rubber base. Where any existing flooring is removed, treat subfloor to include floor leveling, crack suppression membrane where needed, and include replacing all existing building expansion joint covers within the defined scope of work. In the ticketing area of the terminal, install new carpet planks with a defined pattern to be installed with new 4” rubber base. Behind the rental car service desks of the terminal, new carpet planks are to be installed with new 4” rubber base. In the Rental Car Offices of the terminal, install new rubber tiles with 4” rubber base. In the Baggage Claim area, install new carpet planks on the luggage carrousels leaving the maintenance access panels easily accessible and new carpet and rubber base in the side vending room. Designated areas in baggage claim area with terrazzo flooring to have 4” or 6” rubber base replaced.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents