Similar Projects
Last Updated | 02/12/2022 10:24 AM |
Project Title | Expansion of the Smartway Intelligent Transportation System (ITS) on I-40 |
Physical Address | View project details and contacts |
City, State (County) | (Cheatham, Davidson, Dickson, Williamson Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Expansion of the Smartway Intelligent Transportation System (ITS) on I-40 from near I840 in Dickson County (L.M. 11.40) to near U.S. 70S (Exit 196) in Davidson County (L.M. 5.10). Project Length - 21.800 miles Item No. Description Quantity Units 108-03 Cpm Project Schedule (1) Ls 201-01 Clearing And Grubbing (1) Ls 202-04.01 Removal Of Structures (Description, Sta.) (Concrete Median Barrier) (1) Ls 209-08.02 Temporary Silt Fence (With Backing) 3,006.000 l.f. 209-09.01 Sandbags 252.000 Bag 209-20.03 Polyethylene Sheeting (6 Mil. Minimum) 6,300.000 s.y. 705-04.03 Guardrail Terminal (Type 13) 11.000 Each 705-06.01 w Beam Gr (Type 2) Mash Tl-3 2,676.000 l.f. 705-06.20 Tangent Energy Absorbing Term Mash Tl-3 10.000 Each 707-08.11 High-Visibility Construction Fence 12,286.000 l.f. 712-01 Traffic Control (1) Ls 712-02.02 Interconnected Portable Barrier Rail 4,500.000 l.f. 712-02.60 Temporary Work Zone Crash Cushion (Mash Tl-3) 45.000 Each 712-04.01 Flexible Drums (Channelizing) 270.000 Each 712-04.50 Barrier Rail Delineator 225.000 Each 712-06 Signs (Construction) 6,550.000 s.f. 712-08.03 Arrow Board (Type c) 53.000 Each 712-08.12 Queue Protection Truck 1.000 Day 712-09.02 Removable Pavement Marking (8" Barrier Line) 14,895.000 l.f. 713-16.01 Changeable Message Sign Unit 24.000 Each 714-08.09 Light Standards (Description) (30 Ft) 4.000 Each 717-01 Mobilization (1) Ls 725-02.79 Fiber Splice Enclosure(Description) (144 Fiber Optic) 2.000 Each 725-20.01 Cctv Pole & Foundation (50ft Pole w/Lwrng Dvice) 8.000 Each 725-20.02 Cctv Pole & Foundation (80ft Pole w/Lwrng 16.000 Each 725-20.06 Cctv Maintenance Workpad 28.000 Each 725-20.22 Steel Overhead Sign Structure (Spans 51ft To 70ft) (Spans 51ft To 70ft) 1.000 Each 725-20.23 Steel Overhead Sign Structure (Spans 71ft To 90ft) (Spans 71ft To 90ft) 4.000 Each 725-20.24 Steel Overhead Sign Structure (Spans 91ft To 110ft) (Spans 91ft To 110ft) 725-20.28 Steel Overhead Sign Structure (Spans 151ft To 180ft) (Spans 151ft To 180ft) 725-20.43 Pull Box (Type c) 92.000 Each 725-20.44 Pull Box (Type d) 145.000 Each 725-20.45 Pull Box (Type e) 23.000 Each 725-20.55 Cable (1/c #6 Awg.) 68,382.000 l.f. 725-20.57 Cable (1/c #2 Awg.) 25,608.000 l.f. 725-20.58 Cable (1/c #1/0 Awg.) 19,059.000 l.f. 725-20.71 Electrical Connection (1) Ls 725-20.91 Cctv Camera System (Pan Tilt & Zoom) 24.000 Each 725-21.02 Dynamic Message Sign (Multi-Color) (Multicolor) 725-21.11 Network Switch (Type a) 33.000 Each 725-21.12 Network Switch (Type b) 1.000 Each 725-21.14 Network Configuration 1.000 Each 725-21.44 Demarcation Site (Underground Power) 12.000 Each 725-21.85 Uninterruptible Power Supply 30.000 Each 725-21.91 Radar Detection System 28.000 Each 725-21.96 Rds Comm Cable 500.000 l.f. 725-22.22 Conduit Bank (Type 2) 2,223.000 l.f. 725-22.24 Conduit Bank (Type 4) 44,267.000 l.f. 725-22.32 Conduit Bank Bored (Type 2) 2,406.000 l.f. 725-22.34 Conduit Bank Bored (Type 4) 6,331.000 l.f. 725-22.35 Conduit Bank Bored (Description) (Rock, Type 2) 2,558.000 l.f. 725-22.44 Conduit Bank In Rock (Type 4) 28,348.000 l.f. 725-22.45 Conduit Bank Bored (Description) (Rock, Type 4) 33,107.000 l.f. 725-22.64 Structure Conduit Bank (Type 4) 2,833.000 l.f. 725-22.71 2in Conduit 1,674.000 l.f. 725-22.72 2in Conduit Bored 189.000 l.f. 725-22.74 2in Conduit w/Bank 29,594.000 l.f. 725-23.01 Its Cable Marker 191.000 Each 725-23.16 Fiber Optic Cable (144f) 125,492.000 l.f. 725-23.21 Fiber Optic Drop Cable (12 f) 8,804.000 l.f. 725-23.26 Fiber Optic Closure (12 f) 14.000 Each 725-23.27 Fiber Optic Closure (Description) (24 f) 9.000 Each 725-23.28 Fiber Optic Splice Fusion 166.000 Each 725-23.29 Fiber Optic Termination Cabinet 1.000 Each 725-23.31 Fiber Optic Drop Panel ( 12 f ) 33.000 Each 725-24.01 Cabinet (Type a) 6.000 Each 725-24.02 Cabinet (Type b) 16.000 Each 725-24.03 Cabinet (Type c) 9.000 Each 725-24.11 Its Communications Hub (Description) (Field Junction Cabinet) 725-24.25 Unscheduled Maintenance Labor 20.000 Hour 725-24.31 Spare Parts (1) Ls 725-24.41 Burn-In Period (1) Ls 725-24.51 System Integration (1) Ls 725-24.55 As-Built Plans (1) Ls 725-24.61 Training (1) Ls 740-11.02 Temporary Sediment Tube 12in 1,515.000 l.f. 801-01 Seeding (With Mulch) 313.000 Unit 801-01.34 Grass Seed Mix (Ripzn/Flpl) 0.360 Unit |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |