Similar Projects
Harmon Avenue and Center Street Intersection Improvements
Infrastructure
Bidding
Fayetteville, AR 72701

I-49 – Benton Co. Line (Sel. Secs.) (S)
Infrastructure
Bidding
AR

Seal Coating and Re-Striping of the Parking Lot at Arvest Ballpark
Infrastructure
Post-Bid
Springdale, AR 72762

Viney Grove Road - Phase I improvements
Infrastructure
Post-Bid
Prairie Grove, AR 72753

Prairie Grove and Siloam Springs Overlay
Results
Prairie Grove, Siloam Springs, AR

Richmond Road Surfacing
Infrastructure
Results
Farmington, AR 72730

Tontitown Pianalto Rd. Overlay
Infrastructure
Bidding
Tontitown, AR

Construction of the Mission-Razorback Connector
Infrastructure
Post-Bid
Fayetteville, AR

North 40th Street Improvements
Infrastructure
Results
Springdale, AR 72762

CO. Rd. 62 and 87 Overlay
Infrastructure
Bidding
AR

High Performance Cold Mix
Infrastructure
Post-Bid

2021 Springdale Street Overlay
Infrastructure
Results
Less than $850,000 est. value
Springdale, AR

Polymer Resin for Polymer Overlay
Term Contract
Bidding

Fulbright Ramp - North Shiloh Drive Improvements
Infrastructure
Results
Fayetteville, AR 72702

Refurnish Oval of Circle Drive
Term Contract
Bidding
$2,000,000 to $5,000,000 est. value
Fayetteville, AR

Reported 03/21/2022 11:53 AM
Project Title

Y1LB--564-21-2-635-0001 - 564-20-550 LRP Connecting Road

Physical Address View project details and contacts
City, State (County) Fayetteville, AR 72703   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct a new connecting road between the VHSO Main Fayetteville Campus to Leroy R. Pond Clinical and Residential Recovery Services (LRPCRRS) 1100 N. College Avenue, Fayetteville, AR 72703. Complete demolition and construction will include but is not limited to the following: complete and functional Roadway, pedestrian walkway, retaining walls, relocation of under and above ground utilities, exterior lighting, signage and wayfinding, and vegetation.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents