Similar Projects
Shands Pier Removal Project
Infrastructure
Bidding
Green Cove Springs, FL 32043

Grady Brown Park Phase III Improvements
Renovation
Bidding
$924,000 est. value
Freeport, FL 32439

Macdill AFB Marina Wet Slip Repair
Post-Bid
Macdill AFB, FL

MRD - 12Nov2020 - Installation of Waterways Signs, Lights and Pilings
Post-Bid
FL

Repair Waterfront and Storm Sewer Systems at U.S. Coast Guard Station Panama City, FL
Results
$500,000 to $1,000,000 est. value
Panama City, FL 32408

Lignumvitae Key Botanical State Park - Repair and Renovate Dock
Results
Islamorada, FL 33036

The Wharf
New Construction - 11,982 SF
Construction
$965,056 est. value
Saint Augustine, FL 32084

Bay Point Marina
New Construction, Infrastructure
Construction
$10,000,000 est. value
Panama City, FL

Design-Build-Finance Services for North Bulkhead Berths 1-6 Realignment
Infrastructure
Bidding
$300,000,000 est. value
FL

Repairs to East Side of Pier Railing
Post-Bid
Deerfield Beach, FL 33441

F--Debris Removal from FlL Bay and Ever
Results
Everglades, FL

Jacksonville Zoo Boat Dock Improvements
Infrastructure
Bidding
Jacksonville, FL 32218

Depot Facility Bulkhead Repairs
Post-Bid
$1,000,000 to $2,000,000 est. value
Jacksonville, FL

Rebuild UPH STA Ponce de Leon Inlet, New Smyrna Beach, FL
Results
$100,000 to $6,000,000 est. value
New Smyrna Beach, FL 32168

Swann Park Deck Replacement Project
Infrastructure
Bidding
Belle Isle, FL 32809

Reported 12/11/2021 12:00 AM
Project Title

Pelican Harbor Marina - Wave Attenuator Replacement

Physical Address View project details and contacts
City, State (County) Miami, FL 33138   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $735,200
Plans Available from County Agency - 11/08/21
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor, equipment and materials required to comply with the intent of the WORK described in the contract documents including but not limited to: remove existing, dispose and replace approx. 850 LF (10' high) of new 4" x 10" wave attenuator panels and 10" x 10" longitudinal beams at DOCK "A" only using stainless steel hardware. Existing wood support pilings (12" SQ) to be inspected and replaced as needed.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents