Similar Projects
40th Street Townhomes
New Construction
Conception
$5,000,000 est. value
Chattanooga, TN 37407

Harriet Tubman Housing
Renovation
Conception
$600,000 CJ est. value
Chattanooga, TN 37408

Duncan Avenue Six-Plex
New Construction
Design
Chattanooga, TN 37404

3rd / 4th Street Infrastructure - City of Chattanooga
Infrastructure
Design
$8,500,000 est. value
Chattanooga, TN 37403

East Ridge Multimodal
Infrastructure
Post-Bid
East Ridge, TN 37412

Carr Street Apartments
New Construction - 12,404 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Chattanooga, TN 37408

Mill and Pave City Streets
Results
Collegedale, TN 37363

2021 Citywide Resurfacing
Infrastructure
Results
Chattanooga, TN

Park Central Lofts
Renovation - 39,148 SF
Construction
$3,456,104 est. value
Chattanooga, TN 37404

Borough 33 Apartments
New Construction - 97,362 SF
Construction
Less than $50,000,000 est. value
Chattanooga, TN 37410

Pinewood Townhomes
New Construction, Infrastructure
Pending Verification
$66,000,000 CJ est. value
Chattanooga, TN 37421

North River Commerce Center
New Construction, Infrastructure - 800,000 SF
Pending Verification
$102,000,000 CJ est. value
Chattanooga, TN 37415

Alton Park Connector - City of Chattanooga
Infrastructure
Conception
$5,500,000 CJ est. value
Chattanooga, TN 37402

Embassy Suites / Chattanooga
New Construction, Infrastructure - 153,536 SF
Design
$3,000,000 CJ est. value
Chattanooga, TN 37402

899 Cherokee Condominiums
New Construction, Alteration - 18,466 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Chattanooga, TN 37405

Last Updated 01/31/2023 03:56 PM
Project Title

Ridgeview at Northpoint Apartments

Physical Address View project details and contacts
City, State (County) Chattanooga, TN 37415   (Hamilton County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Parking Garage, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction Nearing Completion, Construction start expected October 2021
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for construction of a 200 unit apartment complex that has about 8, 3-story buildings. As of January 31, 2023, this project is nearing completion. Information regarding the general contractor has not been provided.

Details

3 Stories Above Grade, New Construction, New Construction. Parking Spaces, 383 Parking Spaces.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents