Similar Projects
LC 309 311 Remodel
Bidding
$140,000 est. value
Orem, UT 84058

Capitol Aerial Suspension System - Phase I and II
Bidding
Salt Lake City, UT 84111

SLCC Interior Sign Replacement
Post-Bid
Less than $69,000 est. value
Salt Lake City, UT

Crossville Studios Tile or Equal
Post-Bid
Clearfield, UT 84016

Room Partition Walls
Term Contract
Results
Less than $50,000 est. value
Salt Lake City, UT 84112

High School Stage Rigging Systems Replacement
Term Contract
Results
Clearfield, UT 84016

Davis School District High School Stage Rigging Systems Replacement
Construction
Layton, UT 84041

Design, Construct and Install A Bouldering Wall and the Surrounding Padded Flooring
Post-Bid
Orem, UT

U Hospital Interior Signage - Phase 2
Results
Less than $1,200,000 est. value
Salt Lake City, UT

Lozer Style Shelving DABC Installation and Contracting
Post-Bid
UT

Locker Replacement for Centerville and Mueller Park Jr. High Schools
Results
Bountiful, Centerville, UT 84010

Capitol Aerial Suspension System - Phase I
Post-Bid
Salt Lake City, UT 84103

DFCM Construction - Pre Qualified General - Utah Fine Arts Council Remodel - 20251080
Results
Less than $129,140 est. value
Salt Lake City, UT 84102

U Hospital Mediserve Renovo Dock Remodel - Metal Stud Framing
Post-Bid
$1 to $737,500 est. value
Salt Lake City, UT 84113

Fort Herriman Ceiling Addition
Results
Herriman, UT 84096

Last Updated 01/26/2021 05:18 PM
Project Title

Abatement of Asbestos; Window Putty, Vinyl Tile, Paper Material, White Duct Tape, Sheet Vinyl

Physical Address View project details and contacts
City, State (County) Castle Dale, UT   (Emery County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bids for the abatement of approximately 60 sq ft white window putty, 4 sq ft paper material wrapped around a wood support, 100 sq ft white duct tape on ducting, 200 sq ft vinyl tile, and 3 sq ft Sheet vinyl. Work to begin on February 1, 2021 as directed by Owner and to be completed on or before March 1, 2020. Must field verify measurements, locations, and types of ACM.

Details

Division 02 - Existing Conditions, Asbestos Remediation, Asbestos Abatement, Asbestos Floor Tile and Mastic Abatement.
Division 09 - Finishes, Maintenance of Finishes, Maintenance of Tiling, Tile Restoration, Wall Coverings, Vinyl-Coated Fabric Wall Coverings, Flexible Vinyl Wall Coverings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents