Similar Projects
Duluth High School Stem Engineering Lab
Renovation
Bidding
$600,000 CJ est. value
Duluth, GA 30096

Duluth HS Stem Engineering Lab
Renovation - 3,975 SF
Bidding
$750,000 CJ est. value
Duluth, GA 30096

Central Gwinnett High School - Classroom Renovations
Renovation
Post-Bid
Lawrenceville, GA 30046

Central Gwinnett High School Classroom Renovations
Renovation
Post-Bid
$3,000,000 CJ est. value
Lawrenceville, GA 30046

South Gwinnett High School- Kitchen/Cafeteria Renovations
Renovation
Results
Snellville, GA 30078

Dacula Elementary School and Dacula Middle School Classroom Renovations
Renovation - 88,584 SF
Results
Dacula, GA 30019

Jones Middle School - Addition and Modifications
Renovation, Addition
Construction
Buford, GA 30519

Hebron Christian Academy Building Addition
Addition
Construction
Dacula, GA 30019

Hebron Christian Academy Building Addition
Addition, Demolition, Infrastructure
Pending Verification
$600,000 CJ est. value
Dacula, GA 30019

Parkview High School - Cafeteria Modifications - LAN Cabling [Division 27]
Renovation
Bidding
$200,000 CJ est. value
Lilburn, GA 30047

Trickum Middle School Addition and Renovation
Addition, Demolition, Renovation, Infrastructure - 59,631 SF
Post-Bid
$7,000,000 CJ est. value
Lilburn, GA 30047

North Gwinnett High School East Addition
Addition
Results
Suwanee, GA 30024

Additions and Renovations to the Bufford Middle School
Addition, Demolition, Renovation, Infrastructure - 33,106 SF
Post-Bid
$3,000,000 CJ est. value
Buford, GA 30518

Southern High School Field House
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Snellville, GA 30078

Duluth High School Duluth GA
Renovation
Post-Bid
Duluth, GA 30096

Last Updated 01/23/2023 12:32 PM
Project Title

Meadowcreek High School - Classroom Renovations

Physical Address View project details and contacts
City, State (County) Norcross, GA 30093   (Gwinnett County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,259,287 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Fax transmittals and e-mails of bid form/proposal shall not be accepted by the Owner. No phones will be available. All Bidders must submit AIA Document A305, Contractors Qualification Statement, to be evaluated by the Owner and Architect, along with the bid deposit prior to being issued plans and specifications. Bidders who do not submit the AIA A305 will be subject to disqualification. The AIA A305 must show the Contractor's ability to complete the Contract in a satisfactory manner on projects of similar scope and complexity. References from past clients and projects must be included and will be verified. Contract, if awarded, will be on the basis stated in the Instructions to Bidders. No bid may be withdrawn for a period of 60 days after bid opening Bids must be accompanied by a bid bond made payable to the Gwinnett County Board of Education, in the amount equal to 5 percent of the bid price. (Certified or Personal Checks Not Acceptable.) The successful bidder will be required to furnish a Performance Bond and a Payment Bond acceptable to the Gwinnett County Board of Education in an amount equal to 100 percent of the contract price and executed by a Surety Company licensed to do business in the State of Georgia and listed in the Department of the Treasury Circular 570, latest edition. The Surety Company shall have an A.M. Best Company minimum rating of "A" with a financial size of VI "6" or better. Bonds must be accompanied by letter stating bonding company's current rating for verification prior to acceptance by the Owner and execution of the formal Owner/Contractor agreement. Bonding of Subcontractors: Include in the Base Bid, Performance and Labor and Materials Payment Bonds, each in 100% of the subcontract sum, for each Subcontractor having a contract of $50,000.00 or more for Roofing, HVAC, Plumbing, Sprinkler System, Structural Steel Fabricators, Structural Steel Erectors and Electrical Work as required by the General Conditions. The General Contractor cannot change major subcontractors after bid. Contractor and Subcontractor shall require the Attorney-in-Fact who executes bonds on behalf of sureties to attach a certified, current copy of his Power of Attorney. The Gwinnett County Board of Education reserves the right to award the project on whatever basis is in the interest of the Owner and to accept or reject any or all bids and to waive technicalities and informalities.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents