Similar Projects
Pest Control Services
Post-Bid
Toledo, OH

Pest Control
Post-Bid
New Philadelphia, OH 44663

Annual Inspection and Repair of Cranes and Hoists
Results

Annual Inspection and Repair of Cranes and Hoists
Results

Pest Control Services
Post-Bid
Cincinnati, OH 45214

Z--Operations, Maintenance, and Repair Services for EPA Cincinnati
Results
Cincinnati, OH 45268

Integrated Pest Management Program
Term Contract
Post-Bid
Cleveland, OH 44104

Pest Control Services on an "As Needed" Basis
Term Contract
Results
Cleveland, OH 44114

Bed Bug Management Program
Term Contract
Post-Bid
Cleveland, OH 44104

Ice Breaking Services - Vermilion River
Results
Vermilion, OH 44089

Pest Control-Bed Bug Treatment Services
Post-Bid
Portsmouth, OH 45662

Pest Control Services
Results
Less than $90,000 est. value
Columbus, OH 43215

Professional/Maintenance Services
Post-Bid
OH

Pest Control for Copley Township Buildings
Term Contract
Results
Copley, OH 44321

2020 Construction Season Equipment and Labor
Term Contract
Post-Bid
Medina, OH 44256

Reported 04/15/2020 12:00 AM
Project Title

Standpipe Testing Services

Physical Address View project details and contacts
City, State (County) Cincinnati, OH 45214   (Hamilton County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Pump test per NFPA (National Fire Protection Association) with complete operation, documentation and tags annually 2. Wet system test inspection per NFPA 25 with complete visual walk-through, documentation and tags annually 3.. Standpipe test per NFPA 25, complete valve flow and operation, documentation and tags annually 4. The annual inspection tag(s) must contain the name of the individual performing the work and the state fire marshal installer certification number(s) when applicable, date of test, result of inspection and test, and deficiencies or impairments noted. 5. Dry system inspection with complete trip and drain, second drain within 4 weeks. Complete visual walk-through, documentation and tags annually with a hydrostatic test every five years or as directed by NFPA 25. 6. Every 3 years and whenever the system is altered, the dry pipe valve shall be trip tested with the control valve fully open and the quick-opening device, if provided, in service. (NFPA 25 - 13.4.5.2.2.2) 7. Inspect all signage to ensure they are intact and meet local, state and federal requirements.

Details

Division 01 - General Requirements, Quality Control, Testing and Inspecting Services.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents