Similar Projects
Basalt River Park - Phase I & II
New Construction - 14,500 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Basalt, CO 81621

Montessori Children's House of Denver
New Construction - 38,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Denver, CO

Watershed
New Construction, Build-Out - 180,000 SF
Design
$72,000,000 est. value
Denver, CO 80216

Harvard Gulch West Trail (Elevate Denver Bond)
Design
Denver, CO

Meadows Community Center Playground Replacement
Post-Bid
Colorado Springs, CO 80905

Playground Engineered Wood Fiber Installation
Post-Bid
Greeley, CO 80631

Eastonville Regional Trail
Results
Colorado Springs, CO 80900

CO FLAP SUM 91(1), Fremont Pass Trail
Results
$3,000,000 to $5,000,000 est. value
Frisco, CO 80443

Design/Build Services for Tennis Courts
Construction
Colorado Springs, CO 80920

RiNo Art District
Renovation
Conception
Denver, CO 80205

Copper Steppe at Greeley Mall
New Construction
Design
$13,600,000 est. value
Greeley, CO 80634

Estes Park Campground Playgrounds Design, Procure and Install Playground Equipment and Fall Zone Material
Post-Bid
Estes Park, CO 80511

CO FLAP DEN 56(1) Access Connections to ROAR
Results
$3,000,000 to $4,000,000 est. value
Commerce City, CO

Dry Lake Campground & Road Rehabilitation
Design
Steamboat Springs, CO

Stone Canyon Challenge Course Development
Post-Bid
Larkspur, CO 80118

Last Updated 04/23/2021 04:09 AM
Project Title

Santa Rita Park Improvements

Physical Address View project details and contacts
City, State (County) Durango, CO 81301   (La Plata County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To Construct the park improvements project that includes development of one (1) concrete basketball court, two (2) sand volleyball courts, one (1) steel shade shelter, sidewalks and landscape installation. Santa Rita Park Improvements base scope: The Contractor shall construct all components shown on the construction drawings and specifications including, but not limited to: 400 SY of concrete sidewalk, parking lot modifications, relocation of art sculpture and footing, relocation of information kiosk, site furnishings, landscape and irrigation installation with associated site grading. Santa Rita Park Volleyball Courts, Basketball Court & Shade Shelter base scope: Santa Rita Park Improvements. The Contractor shall construct all components shown on the construction drawings and specifications for one (1) lighted concrete basketball court, two (2) lighted sand volleyball courts with associated site grading, and one (1) 20’ x 44’ steel shade shelter. The base scope of the Santa Rita Park volleyball courts, basketball court and shade shelter has Davis Bacon wage and American Iron & Steel requirements.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents