Similar Projects
Construct 149FW RSS Pad
Design
$500,000 to $1,000,000 est. value
San Antonio, TX 78236

Pedestrian Crossing Improvements at Royalgate and Military Drive
Bidding
San Antonio, TX 78242

Walking Track - Copperfield Elementary School
Post-Bid
Converse, TX 78109

Seeling Channel Phase 3 Project
Post-Bid
$15,080,000 est. value
San Antonio, TX 78205

New Asphalt Parking Lot at 811 Jackson Street
Results
Less than $88,075 est. value
San Antonio, TX 78200

Concrete Repair and Replacement
Term Contract
Results
Schertz, TX 78154

River Walk Improvements Phase VI
Post-Bid
Less than $2,850,000 est. value
San Antonio, TX 78205

Maverick Creek Trail Connection
Results
$1,700,000 est. value
San Antonio, TX 78205

Repair and Resurfacing of the Cross Creek Apartments Parking Lot
Post-Bid
San Antonio, TX 78218

Labor and Materials for Concrete Work for Park Operations
Term Contract
Results
$6,300,000 est. value
San Antonio, TX 78200

Annual Contract for Ready Mix Concrete
Term Contract
Post-Bid
San Antonio, TX 78200

FY 2020 Flatwork TOC Package 6
Results
$2,500,000 est. value
San Antonio, TX 78205

General Concrete Work
Term Contract
Post-Bid
San Antonio, TX

Concrete and Asphalt Maintenance, Repair and Replacement Services
Results
San Antonio, TX 78204

HEB - Turn Lane Improvements
Post-Bid
San Antonio, TX

Last Updated 10/15/2020 12:42 PM
Project Title

2020 Annual Concrete Placement Work Order Construction Contract, Package II Project

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78212   (Bexar County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Concrete, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $466,967
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This contract includes, but is not limited to, furnishing all materials, equipment, labor, and supervision for the construction of concrete curbs, sidewalks, driveways, retaining walls, wheel chair ramps, steps, rip rap, other designated concrete items, and associated work throughout the SAWS service area on an annual work order contract.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents