Similar Projects
Replacement of AHU 9 - Halifax Health 4th Floor CVOR
Bidding
Daytona Beach, FL 32116

Membrane Roof Rehabilitation Deland Police Department Building
Post-Bid
Less than $100,000 est. value
De Land, FL 32720

Halifax Health T-Zone Air Handling Unit Replacement
Post-Bid
Daytona Beach, FL 32100

FDOT HVAC Install: Sneads WB Weigh Station
Results

442 South Beach Street Roof Replacement
Results
Less than $120,000 est. value
De Land, FL 32720

Seabreeze High School HVAC, Ceiling and Lighting Building 1
Post-Bid
Daytona Beach, FL 32118

Lakeside HVAC and Ceiling Replacement
Results
Less than $400,000 est. value
Port Orange, FL 32129

Roofing Envelope Services
Post-Bid

Direct Replacement of 60 Ton Chiller and Two 30 Ton Air Handlers
Results
Daytona Beach Shores, FL 32116

Roof Coating of Florida Highway Patrol(Fhp)Troop K Building #4715 Lake Worth, Florida`S Turnpike Mainline(Sr 91), Milepost 94.0
Post-Bid
Greenacres, FL 33467

Emergency Vehicle Exhaust Extraction System
Term Contract
Results
Less than $80,000 est. value
De Land, Lake Helen, New Smyrna Beach, FL 32169

Roof Replacement Halifax Health Daytona Beach Campus 1963 Building
Post-Bid
Daytona Beach, FL 32114

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Roof Replacement Halifax Health Daytona Beach Campus Service Building
Post-Bid
Daytona Beach, FL 32114

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Last Updated 08/11/2020 11:47 PM
Project Title

Medical Examiner Lab Roof and Mechanical Equipment Replacement

Physical Address View project details and contacts
City, State (County) Port Orange, FL 32124   (Volusia County)
Category(s) Single Trades
Sub-Category(s) HVAC, Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $285,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Remove existing lightning protection system at west roof area, retain for reinstallation, store and protect as required for reuse upon completion of the roof replacement. 2. Remove existing rooftop ventilation equipment, replace or reinstall as defined by the mechanical engineering drawings, install new curbs, (or raise existing), as defined by the project documents. 3. Remove existing rooftop split-system (air handling and condenser units) and replace as defined by the mechanical engineering drawings, install new curbs, (or raise existing) and counterflashing receivers, as defined by the project documents. 4. Remove existing rooftop cooler/freezer refrigeration equipment, replace or reinstall as defined by the mechanical engineering drawings, fabricate and install new galvanized steel support rack system as defined by the project details. 5. Remove existing rooftop utility weatherheads, provide and install two new curbmounted utility weatherheads at the existing locations as defined by the project details. Abandoned the third weatherhead location for the large condenser unit, cover the roof deck penetration with a galvanized steel plate and secure. 6. Provide DDC controller for new AHU and CU, provide DDC front end to interface existing Trane rooftop unit, new split system and existing legacy Barber Colman points. DDC control system should provide communication with Volusia County Monitoring system and provide requested points and parameters. 7. Provide Test and Balance in areas of Medical Examiners office to reduce overall outside air demand as indicated on the Mechanical drawings. 8. The design intent is to have the mechanical, plumbing and electrical work substantial complete prior to removal of the existing roof and flashing system to minimize damage to the new roof system by the other trades. 9. Remove existing copings, and cap flashing from the designated roof area, including the area divider between roof areas, copings to remain at east roof area. Area divider coping may be reused if undamaged and size is correct. 10. Remove existing modified bitumen surfaced built-up roof membrane and rigid insulation system down to the existing fluted steel roof deck at the west roof. 11. Repair and/or replace any damaged or deteriorated wood blocking per unit cost allowance. Repair any damaged steel deck areas per unit cost allowance. 12. Remove the center portion of masonry roof edge at the west wall, and existing gutter as required to construct new parapet wall at the west delivery canopy per the project details. Clad with new stainless steel fascia and provide transition flashing onto existing delivery canopy to remain. 13. Remove and replace primary gutter system per the project details, connect new downspouts into the existing underground drainage system. 14. Add pressure treated wood blocking along the top of the masonry parapet and plywood sheathing at the interior of the parapet per the project details to create a smooth, nailable substrate for the new base flashing and coping cap. 15. Mechanically fasten a non-tapered rigid board insulation system to the metal deck, provide drainage crickets (with 45 degree angle valley lines) at the high side of all curbs and east of the new parapet wall per the project plans. 16. Fully adhere a 1/4" gypsum roof coverboard to the rigid insulation, tape all joints and fully prime. 17. Torch apply a single layer of smooth surfaced modified bitumen interply membrane over the gypsum roof board. 18. Adjust height of required penetrations and roof curbs to provide a minimum of 8” above the finished roof surface. 19. Apply by means of torch application, a second layer of smooth surfaced modified bitumen interply membrane over the preceding interply membrane. 20. Torch apply a granular surfaced modified bitumen cap sheet to the interplies. 21. Apply a two-ply, granular surfaced, SBS modified bitumen base flashing system at all curbs, parapets, and roof-to-wall transitions per the project details. 22. Install new pre-fabricated aluminum roof access ladder at west wall, provide new concrete slab at grade, secure ladder to slab and existing masonry wall. 23. Install new PVC condensate drain piping and non-penetrating pipe (or conduit) support systems per the project details. 24. Install all new protective cap and base flashings such as, parapet and pilaster coping caps, transitions, counterflashings, etc. per the project details. 25. Install new extruded aluminum downspouts per the project plans. Reinstall lightning protection system in accordance with specifications, details and UL requirements. Upon completion, system shall be inspected by a UL representative and a ‘Letter of Findings’ provided as certification that the system has been installed in accordance with applicable codes and regulations. 26. Clean and protect work as required, repair any adjacent surfaces damaged or soiled during the execution of the work of this contract. Clean-up site and close out project per specification requirements. 27. Roof system manufacturer to provide a 20 year, no dollar limit (NDL) weathertightness warranty with a wind uplift rider for a 145 mph factored, (112 mph nominal), wind speed, or equivalent wind uplift pressures.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents