Similar Projects
Hamilton School Watermain Loop
Infrastructure
Bidding
Sussex, WI

2022 Road and Utility Improvements
Infrastructure
Bidding
$1,778,600 est. value
Pewaukee, WI

Manhattan Drive Water Main Replacement
Post-Bid
$395,000 est. value
Menomonee Falls, WI 53051

2021 Road Program
Post-Bid
Brookfield, WI 53045

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Menomonee Park DEA Asphalt and Concrete Paving
Results
Menomonee Falls, WI 53051

Sports Commons Parking Lot Improvements
Infrastructure
Bidding
$110,000 est. value
Waukesha, WI 53188

2021 Road and Parking Lot Crack Fill and Striping
Infrastructure
Post-Bid
WI

Adelaide and TRU Storm Sewer
Results
Brookfield, WI 53005

Tenny Avenue, Newhall Avenue and Pilot Court Utility and Street Improvements
Infrastructure
Bidding
Waukesha, WI 53189

Northview Road Sidewalk
Infrastructure
Post-Bid
$65,000 est. value
Pewaukee, WI 53072

Calhoun Road, CTH M to STH 190, Calhoun Road, CTH M to STH 190
Results
WI

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Waukesha Water Utility - Contract Package 2B
Results
Waukesha, WI

City Wide Concrete Sidewalk Replacement
Infrastructure
Post-Bid
Waukesha, WI

Last Updated 03/22/2022 02:59 PM
Project Title

Meadowbrook Farms Phase 2 and Northview Road Sidewalk

Physical Address View project details and contacts
City, State (County) Pewaukee, Waukesha, WI 53189   (Waukesha County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,135,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Meadowbrook Farms Phase 2, involves approximately 12,700 S.Y. full depth pavement milling, 4,100 tons asphaltic concrete pavement, 1,450 L.F. concrete curb and gutter, 15 each storm structure repairs, 12 each sanitary structure repairs, 9 each water valve repairs, storm sewer CIPP lining, and storm sewer replacement.Northview Road Sidewalk, involves approximately 4,670 S.F. of 4-inch concrete sidewalk, 170 S.F. of concrete pedestrian ramp and landing, 50 L.F. of storm sewer, 55 L.F. of culvert pipe, 1 each field inlet, 890 L.F. of ditching, 1 L.S. of install retaining walls, 90 L.F. concrete curb and gutter, and restoration.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents