Similar Projects
Regional Trails and Pathways Rehabilitation
Renovation
Bidding
Minneapolis, MN

100,000 Gallon Elevated Water and 200,000 Gallon Ground Clear Well Tank - Part 1
Infrastructure
Bidding
Blooming Prairie, Minneapolis, MN

Prairie Knoll Park North Parking Lot Paving and Tom Anderson Trail Maintenance Improvements
Post-Bid
$330,000 est. value
Andover, MN 55304

Cleaning and Lining Water Mains
Post-Bid
Minneapolis, MN

CSAH 34 (Birch Street) Improvements
Results
Lino Lakes, MN 55014

CSAH 116 (Bunker Lake Boulevard) at TH 47 (St Francis Boulevard) Intersection Improvements
Results
$3,700,000 est. value
Ramsey, MN 55303

2021 Additional Pavement Overlay Improvements
Infrastructure
Bidding
Ramsey, MN

North Smoky Hills Graveling
Renovation
Post-Bid

2021 Street Improvements
Results
$2,300,000 to $2,700,000 est. value
Lino Lakes, MN

2021 Concrete Paving Rehabilitation
Post-Bid
Minneapolis, MN

Grading, Bituminous Surfacing, Signals, ADA Improvements, TMS and Bridge No. 02552
Results
MN

99th Avenue and 101st Avenue Rehabilitation Improvement
Post-Bid
$1,300,000 est. value
Blaine, MN

Parking and Pedestrian Safety Upgrades at AMRTC - General
Results
Less than $550,000 est. value
Anoka, MN 55303

2021 Water System Looping Improvements
Renovation
Post-Bid
$180,000 to $210,000 est. value
Minneapolis, MN

Parking and Pedestrian Safety Upgrades at AMRTC - Electrical
Results
Less than $550,000 est. value
Anoka, MN 55303

Last Updated 06/30/2021 02:32 PM
Project Title

2021 Street Rehabilitation

Physical Address View project details and contacts
City, State (County) Columbia Heights, MN   (Anoka County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,490,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Zones 4B and 5 Street Rehabilitation consists of 11 blocks of partial street reconstruction and 13 blocks of mill and overlay. State Aid Street Rehabilitation consists of 6 blocks of mill and overlay. Work includes minor utility construction, spot curb and gutter and sidewalk replacement, and pedestrian ramp improvements. Project includes the following major quantities: Remove MH/CB 13Ea Salvage MH/CB casting 84Ea Salvage hydrant 6Ea Remove hydrant lead,GV and box 24LF Remove concrete curb and gutter 3,300LF Remove concrete walk 17,200SF Common excavation, EV 3,900CY Aggregate base, Class 5 1,750 Ton Full depth reclamation 21,500SY Stockpile/respread reclaimed material 4,500 CY Mill bituminous pavement 29,750SY Sawed and sealed joint 6,600LF Bituminous paving 8,850Ton Hydrant 6Ea 6” Hydrant GV and box 6Ea Install new MH/CB casting 71Ea Construct CB 13Ea 4” Concrete walk 17,300SF Concrete walk ADA 3,300SF Concrete curb and gutter 3,300LF Loop detectors 2Ea Turf restoration 2,500SY 4” Solid/broken line – Epoxy 3,650LF Preform tape ground in 180SF

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents