Similar Projects
Permanent Modular with Slab-On-Grade at Faller Elementary School
Alteration
Post-Bid
$1,000,000 est. value
Ridgecrest, CA 93555

Pavement Resurfacing - Lockwood Valley Road (West)
Infrastructure
Results
$5,582,735 CJ est. value
Maricopa, CA 93252

Improvements on Diamond Street from Orange Street to Rosamond Boulevard
Infrastructure
Results
$325,472 CJ est. value
Rosamond, CA 93560

Cornerstone Subcontractor
New Construction, Infrastructure
Results
$492,844 CJ est. value
Bakersfield, CA 93308

Contract for Construction of Hud-funded Curb, Gutter and Sidewalk Benton Area
Infrastructure
Results
$269,600 CJ est. value
Bakersfield, CA 93304

2nd Street Landscape and Pedestrian Improvements
Infrastructure
Results
$319,650 CJ est. value
McFarland, CA 93250

HSIP Cycle 10, State Funded Project
Infrastructure
Results
$785,600 CJ est. value
Ridgecrest, CA 93555

Fitness Court Shade Structure
Renovation
Post-Bid
$115,138 CJ est. value
McFarland, CA 93250

SB Minor B- Cold plane AC pavement and place HMA (Type A) - in Kern County
Infrastructure
Results
$282,910 CJ est. value
Bodfish, CA 93205

HUD-Funded Curb, Gutter, and Sidewalk Oleander Area
Infrastructure
Results
$326,364 CJ est. value
Bakersfield, CA 93301

Street Improvements 2021-2022: Hosking Avenue from Stine Road to Leprechaun Way
Infrastructure
Results
$652,128 CJ est. value
Bakersfield, CA 93301

Linnell-Brahma Park 6210 Brahma Street (Re-Bid)
Infrastructure
Results
$5,279,281 CJ est. value
Bakersfield, CA 93307

Sports Court Resurfacing
Infrastructure
Results
$291,450 CJ est. value
Bakersfield, CA 93301

Annual Contract for Concrete Construction
Infrastructure
Results
$1,281,085 CJ est. value
Bakersfield, CA 93301

Bakersfield High School Warren Hall Modernization Descope Phase 2 - Teachers' Lounge & Restrooms - Selective Demolition
Renovation
Sub-Bidding
$321,948 CJ est. value
Bakersfield, CA 93304

Last Updated 09/19/2023 03:12 PM
Project Title

Bakersfield High School Warren Hall Modernization Descope Phase 2 - Teachers Lounge & Restrooms - Concrete

Physical Address View project details and contacts
City, State (County) Bakersfield, CA 93304   (Kern County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $94,685 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project Number - KC #05-1-22006, DSA #03-118972 The following table provides a summary of asbestos-containing materials found in the buildings scheduled to be renovated at the site. Included with the project manual are FACSs Functional Space Notes Report and building diagrams noting the space numbering used in the report. Contractors are responsible for review of project drawings to determine areas being impacted by their individual scopes of work and determine presence or absence of hazardous materials within the area to determine if remediation will be necessary to complete the project. This project is anticipated to start on approximately see Exhibit A and is anticipated to have a duration as defined in the Construction Managers Construction Schedule for completion. The entire project is anticipated to have a duration of three hundred sixty-three (363) calendar days. Liquidated Damages $1,000.00 per calendar day Start/Delivery Date June 2, 2024 Project Duration 363 calendar days as defined in Construction Managers Schedule Online Q&A No Scope of Services Concrete Please note that prequalification is required Pursuant to Public Contract Code Sections 20111.6 for the Prime Contractor with license classifications A, B, C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 and C-46 and any listed subcontractors with license classifications C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 and C-46. The contractor must be on the Kern High School Districts Prequalified Contractor Listing. Non-Compliance with this requirement may deem the prime contractor non-responsive. You may submit your Pre-Qualification Questionnaire at Electronically Anticipated Award Date is Monday, October 2, 2023

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents