Similar Projects
Last Updated | 09/08/2021 07:48 AM |
Project Title | Middd Segment 6 Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Clinton Township, MI 48038 (Macomb County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project includes the following Work: 1. Structural lining of approximately 2,100 feet of the 5-foot inside diameter 15 Mile Interceptor (PCI-15C) from Garfield Road, east along the north side of 15 Mile Road 2. Construction of a new access shaft to facilitate PCI-15C structural lining 3. Structural lining of an approximate 1,200-foot long curved portion of the 11-foot inside diameter Romeo Arm Interceptor (PCI-12A) approximately at the intersection of Garfield Road and 15 Mile Road 4. Spray-lining of various structures along the reach of this project including the FR-S-1 metering facility sewer pipes. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |