Similar Projects
HVAC Heating and Cooling Systems
Renovation
Design
$110,000 CJ est. value
Mills, WY 82644

HVAC System Upgrade Phase 2
Renovation
Sub-Bidding
$5,000,000 CJ est. value
Cheyenne, WY 82001

Chapel HVAC
Renovation
Sub-Bidding
$96,000 CJ est. value
Lander, WY 82520

H941--Airflow Test and Balance (Tab) and HVAC Controller Services
Term Contract
Post-Bid
Loveland, CO - Cheyenne, WY 82001

Replace the Pneumatic HVAC controls
Alteration
Post-Bid
Cody, WY 82414

Story Elementary HVAC Upgrade
Alteration
Results
$100,000 est. value
Story, WY 82832

Purchase and Installation of Boiler for County Courthouse Snowmelt System
Renovation
Results
$117,343 CJ est. value
Laramie, WY 82070

Ventilation Upgrade - Elk Mountain, Wyoming
Renovation
Sub-Bidding
$326,339 CJ est. value
Elk Mountain, WY 82324

Cooling Upgrades
Term Contract
Post-Bid
Casper, WY 82601

Rocky Mountain High School Ventilation Improvement
Renovation
Results
$419,914 CJ est. value
Cowley, WY 82420

UW Cheyenne Family Medicine Clinic - Temperature Controls Upgrades
Alteration
Post-Bid
Laramie, WY 82071

Sheridan College Whitney Center for the Arts IT Core ACU-2 Replacement
Renovation
Results
$245,735 CJ est. value
Sheridan, WY 82801

Exhaust Fans for Agriculture Building
Alteration
Post-Bid
Laramie, WY 82071

Waste Water Collections Building HVAC Upgrades
Renovation
Results
$103,000 CJ est. value
Casper, WY 82609

As Needed HVAC Testing and Balance Services at the Thyra Thompson Building
Alteration
Post-Bid
Casper, WY 82601

Last Updated 05/11/2023 03:31 AM
Project Title

Core Systems: Chapel HVAC

Physical Address View project details and contacts
City, State (County) Lander, WY 82520   (Fremont County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Owner To Subcontract, Bids by Invitation
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Mechanical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing Chapel Air Handlers, Coils and Condensing units. Add 2 new furnaces with D/X Air Conditioning with associated ductwork, piping, electrical, and controls, for the Chapel. Second, add 1 new furnace with D/X Air Conditioning with associated ductwork, piping, electrical, and controls, for the upper Classroom and Foyer. Mechanical contractors are the Prime Bidders, and may need subcontractors (Electrical, Controls, Test and Balance, etc.) to complete the entire work as described in the specifications and drawings. Products or systems may be provided under a Value Managed Relationship (VMR) the Owner has negotiated with the supplier. VMR products and systems are indicated as such in the Specifications. TIME OF SUBSTANTIAL COMPLETION: The time limit for substantial completion of this work will be 45 calendar days and will be as noted in the Agreement.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents