Similar Projects
Country Club Expansion
Renovation
Conception
Glenview, IL 60025

Greenwood Stormwater Basin
Post-Bid
Niles, IL 60714

Maine South HS Synthetic Turf Replacement
Post-Bid
Park Ridge, IL 60068

Terminal Area Fire Main Relocation - Lower Level Utility and Pavement Reconstruction
Results
Chicago, IL

Sidewalk, Curb
Results
Hanover Park, IL

Renewable Energy & Urban Farming Campus
New Construction - 13,000 SF
Construction
$36,000,000 est. value
Chicago, IL 60661

Woodfield Village Green Demolition & Shell Package
Renovation, Demolition - 101,267 SF
Construction
Schaumburg, IL 60173

Grasslands Grading Improvements
Post-Bid
Orland Park, IL

2021 Crack Routing and Sealing
Results
Hanover Park, IL

Site Paving
Post-Bid
Elgin, IL 60120

Pavement Resurfacing
Results
Less than $2,760,387 est. value
Palatine, IL

HMA Resurfurfacing
Post-Bid
IL

Crack Filling/Seal Coating/Striping at Triphahn Center Parking
Results
Hoffman Estates, IL 60169

Northwest Parking Lot Improvements
Post-Bid
IL

Asphalt at Birch Park
Results
Hoffman Estates, IL 60169

Last Updated 08/05/2022 05:03 PM
Project Title

2022 Municipal Parking Lot Improvements

Physical Address View project details and contacts
City, State (County) Tinley Park, IL 60477   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $275,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project Category Code: Concrete Pavement, Parking Lots/Ramps, Concrete Repair , Pavement Resurface and Rehabilitation, Pavement - Marking, Concrete/Formed/Flatwork/Foundation, Asphalt Overlay, Rehab. and/or Maint. Description: This project shall consist of the removal and replacement of hot-mix asphalt surface course, various pavement patches, concrete curb and gutter removal and replacement, concrete driveway removal and replacement, concrete sidewalk removal and replacement, pavement markings, and all incidental and collateral work necessary to complete the improvement as shown on the exhibits and as described herein.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents