Similar Projects
Saint Stephen Church Multi-Purpose Building
New Construction - 7,500 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Kingsville, MD 21087

ICCP Barn Building
New Construction - 1,965 SF
Design
$500,000 est. value
Potomac, MD 20852

Good Hope Presbyterian Church Addition
Renovation, Addition - 16,489 SF
Post-Bid
$2,700,000 est. value
Fulton, MD 20759

John Wesley Church
Renovation
Post-Bid
Oxford, MD 21654

Washington DC LDS Temple Renovations
Renovation - 160,000 SF
Construction
$75,000,000 to $80,000,000 est. value
Kensington, MD 20895

Asbury United Methodist Church
Renovation
Construction
Easton, MD 21601

Harford Islamic Center
Renovation
Pending Verification
Bel Air, MD 21015

Youth Ministries Building
New Construction - 12,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Huntingtown, MD 20639

Fourth Presbyterian Church - Sanctuary
Renovation - 24,000 SF
Design
Bethesda, MD 20816

Church of Reconciliation
New Construction - 21,800 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Forest Hill, MD 21050

Mount Carmel Baptist Church
New Construction
Construction
Princess Anne, MD 21853

Old Apostolic Lutheran Church
New Construction
Pending Verification
Elkton, MD 21921

Chestertown Hope Fellowship Church
New Construction - 17,172 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Chestertown, MD

Chapel Interior
Post-Bid
Saint Marys City, MD 20686

First Christian Community Baptist Church
Renovation - 2,500 SF
Construction
$830,000 est. value
Baltimore, MD 21215

Reported 05/07/2022 12:00 AM
Project Title

Fire Sprinkler And Alarm Replacement

Physical Address View project details and contacts
City, State (County) Germantown, MD 20874   (Montgomery County)
Category(s) Religious/Funeral
Sub-Category(s) Religious Facility
Contracting Method Bids by Invitation.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of Vestibule 159 ceiling and removal and reinstallation of attic vent to allow the replacement of the existng wet and dry sprinkler system, and complete removal and replacement of the fire alarm system.

Details

Religious Facility, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 28 - Electronic Safety and Security, Access Control, Access Control Interfaces, Access Control Interfaces to Fire Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents