Similar Projects
Christophers Crossing Corridor - West Side Extension - 310006 - City of Frederick
Infrastructure
Conception
$15,000,000 est. value
Frederick, MD 21702

Christophers Crossing Corridor - West Side Extension - 310006 - City of Frederick
Infrastructure
Conception
$15,000,000 est. value
Frederick, MD 21702

Mill Creek Subdivision
New Construction
Design
Frederick, MD

Chesapeake and Ohio Canal National Historical Park Level 33 Wall and Roadway Repair
Alteration
Design
Knoxville, MD

Chesapeake and Ohio Canal National Historical Park Level 33 Wall and Roadway Repair
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
Clear Spring, Knoxville, MD 21722

Galvanized Pipe Replacement (RGH)
Post-Bid
Laurel, MD 20707

Surface Abrasion and Diamond Grinding of Roadways at Various Locations Statewide
Infrastructure
Post-Bid
$1,000,000 to $2,500,000 est. value

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

Sports Complex Construction
Results
Brunswick, MD 21716

Woodlands At Urbana - Phase 3 Roads
Construction
Urbana, MD

Woodlands at Urbana - Phase 4 Paving
Construction
Urbana, MD

Monocacy Manor
New Construction, Infrastructure
Pending Verification
$81,000,000 CJ est. value
Frederick, MD 21701

Renn Park - 410035 - City of Frederick
New Construction, Infrastructure
Conception
Less than $500,000 est. value
Frederick, MD

Leak Detection Services
Infrastructure
Post-Bid
Walkersville, MD

Resurfacing of Mountain Road
Results
Thurmont, MD 21788

Last Updated 07/22/2022 10:33 AM
Project Title

East End Park Trail Paving

Physical Address View project details and contacts
City, State (County) Thurmont, MD 21788   (Frederick County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $14,903 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 22, 2022, project was awarded to Pleasants, awarded amount is $14,902.51.** Summary of the Work: All construction and site work as specified in the contract documents Clean up and repair of site work damaged or altered during construction Any questions can be answered by calling Project Manager, Kelly Duty at (301) 271- 7313, ext. 215 or Director of Public Works, Harold Lawson at (240) 674-0086.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents