Similar Projects
Flood Protection - City of San Jose
Infrastructure
Conception
$7,986,000 est. value
San Jose, CA 95134

Tully Road Ballfields Dog Park Improvements - City of San Jose
Renovation, Infrastructure
Conception
$500,000 est. value
San Jose, CA 95121

Costco - Westgate West / San Jose
Demolition, New Construction, Infrastructure - 166,058 SF
Design
$46,000,000 CJ est. value
San Jose, CA 95129

Main Street Milpitas
New Construction, Infrastructure - 350,257 SF
Design
$16,300,000 CJ est. value
Milpitas, CA 95035

Place Polyester Concrete Overlay and HMA (Type A)
Infrastructure
Bidding
$1,600,000 CJ est. value
Santa Clara, CA 95054

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

SCWP - Site Preparation Project
Infrastructure
Results
Sunnyvale, CA

Combination Pressure Reducing and Pressure Sustaining Valves
Term Contract
Results
Santa Clara, CA

Forest Hill Elementary School Phase One
New Construction
Construction
$4,500,000 est. value
San Jose, CA 95130

Eterna Tower
New Construction, Infrastructure - 1,500 SF
Pending Verification
$37,000,000 CJ est. value
San Jose, CA 95113

Hemlock Avenue Mixed Use Development
New Construction, Infrastructure - 11,910 SF
Pending Verification
$24,000,000 CJ est. value
San Jose, CA 95128

Route 87/Taylor Bike/Ped Improvements - City of San Jose
Infrastructure
Conception
$532,000 est. value
San Jose, CA 95110

Monterey Road Guardrail Project
Infrastructure
Design
$1,835,020 CJ est. value
San Jose, CA 95138

Construction at Huff Gardens Apartments - Exterior Envelope and Site Improvements
Infrastructure
Post-Bid
$525,000 CJ est. value
San Jose, CA 95128

Last Updated 09/28/2022 01:19 AM
Project Title

Sanitary Sewer Repairs FY 2021-2022 Package V

Physical Address View project details and contacts
City, State (County) San Jose, CA 95112   (Santa Clara County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $848,456 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally involves evaluating the condition of 37 selected 6, 8, and 10-inch diameter Vitrified Clay Pipe (VCP) sewer segments, approximately 10,717 linear feet, perform necessary point repairs prior to lining, and install approximately 10,554 linear feet of Cured-in-Place Pipe (CIPP) liner. The City will not respond to any communication or question submitted directly to City staff or City consultants. Submit questions via Online no later than May 19, 2022 at 3:00 pm. Each bid must be accompanied by cash, a certified check, a cashier's check or a bidder's bond in the sum of not less than 10% of the total aggregate amount of the bid. Checks shall be made payable to the order of the City of San Jose. Bonds shall be executed by a surety possessing a valid certificate of authority issued by the California Department of Insurance and shall name the City of San Jose as beneficiary. All bids must be addressed to the Director of Public Works, City of San Jose, shall bear the Project Number and Name and be in a sealed envelope. This project is a "public works" as defined in Sections 1720 through 1720.6 of the California Labor Code. In accordance with Chapter 14.09 of the San Jose Municipal Code entitled "Prevailing Wage Requirements for City Contracts Involving Public Works," the contractor will be required to comply with the prevailing wage provisions in California Labor Code Sections 1720 through 1861, and the City's Office of Equality Assurance is authorized to provide certain local enforcement of those provisions. As such, the contractor will need to pay not less than the general prevailing rate of per diem wages and the general prevailing rates for holiday and overtime work. Bidders must have a California contractor's license, classification A to bid this project. The Nondiscrimination/Nonpreferential Treatment requirements of Chapter 4.08 of the San Jose Municipal Code apply to this project. Bidder's attention is directed to those provisions of the Specifications which require the contractor to whom the contract for the work is awarded, to file with the City Clerk at the time the contract is executed, a Contractor's Payment Bond and a Bond for Faithful Performance meeting all the requirements of the Specifications and approved by the City Attorney of the City of San Jose. Bonds shall be executed by a surety possessing a valid certificate of authority issued by the California Department of Insurance and shall name the City of San Jose as beneficiary. The Contractor's Faithful Performance Bond shall be for 100% of the contract amount. The Contractor's Payment Bond shall be for 100% of the contract amount. Request for Information date from May 19, 2022 to June 02, 2022 Question Deadline 06/02/2022 03:00:00 PM PT

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents